221 69 18MB
English Pages 536 [277] Year 2016
parastaneja.blospo t.in (VOLUME I)
By
Dr. B.C. PUNM IA Formerly, Professor and Head, Deptt. of Civil Engineeri ng, & Dean, Faculty of Engineeri ng M.B.M. Engineeri ng College,
Jodhpur
Er. ASHOK KUMAR JAIN Director, Arihant Consultan ts, Jodhpur
Dr. ARUN KUMAR JAIN Assistant Professor M.B.M. Engineer ing College, Jodhpur
SIXTEENTH EDITIO N (Thoro ughly Revise d and Enlarg ed)
LAXMI PUBLICATIONS (P) LTD e GUWAHATI e HYDERABAD BANGALORE e CHENNAI e COCHIN e RANCHI e NEW DELHI MUMBAI e W LUCKNO e A KOLKAT e JALANDHAR INDIA e USA • GHANA e KENYA
......_
rI
SURVEYING-I © 1965, 1984, 2005 © 1994, 2005
B.C. PUNMIA ASHOK KUMAR JAIN, ARUN KUMAR JAIN
; \
Copyright © by Authors .
All rights reserved including those of translation into other languages. In accordance with the Copyri ght (Amend ment) Act, 2012, no part of this publica tion may be reproduced, stored in a retrieval system, or transm itted
in any form or by any means, electronic, mechanical, photocopying,
recording or otherwise. Any
such actor scanning, uploading, and or electro nic sharing of any part of this book withou t the permission of the publish er constitu tes unlawfu l piracy and theft of the copyrig ht holder' s intellec tual propert y. If you would like to use materia l from the book (other than for review purpose s), prior written permiss ion must be obtaine d from the publishers. Printed and bound in India Typeset at : Arihant Consultants, Jodhpur. First Edition: 1965, Second Edition : 1966, Third Edition : 1972, Fourth Edition : 1976, Fifth Edition : 1978 Sixth Edition : 1980, Seventh Edition : 1981, Eighth Edition : 1983, Ninth Edition : 1985, Tenth Edition : 1987 Eleventh Edition : 1988, Twelfth Edition : 1990, Reprint : 1991, 1992, 1993, Thirteenth Edition : 1994 Reprint : 1995, 1996, Fourteenth Edition : 1997, Reprint : 1998, 1999, 2000, Fifteenth Edition : 2002 Reprint : 2003, 2004, Sixteen th Edition: 2005, Reprint : 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014 E5U-0603·495-5URVEYING I (E)-PUN
Price:
~
495.0 0
Limits of Liability/Disclaimer of Warran ty: The publisher and the author make no represe ntation or warranties with respect to the accuracy or comple teness of the content s of this work and specifically disclaim all warranties. The advice, strategies, and activities contained herein may not be suitable for every situation. In performing activitie s adult supervision must be sought. Likewise, commo n sense and care are essential to the conduc t of any and all activitie s, whethe r described in this book or otherwise. Neither the publisher nor the author shall be liable or assume s any responsibility for any injuries or damages arising herefro m. The fact that an organization or Website if referred to in this work as a citation and/or a potential source of further information does not mean that the author or the publish er endorse s the information the organization or Website may provide or recomm endatio ns it may make. Further, readers must be aware that the Interne t Websites listed in this work may have change d or disappe ared betwee n when this work was written and when it is read. All trademarks, logos or any other mark such.as Vibgyor, USP, Amanda, Golden Bells, Firewall Media, Mercury, Trinity, laxmi appearing in this work are tradem arks and intellec tual propert y owned by or licensed to Laxmi Publications, its subsidiaries or affiliates. Notwithstanding this disclaimer, all other names and marks mentio ned in this work are the trade names, trademark's or service marks of their respect ive owners .
,10
Bangal ore
080-26 75 69 30 044-24 34 47 26 0484-2 37 70 04, 405 13 03
~ ~ Hyderabad .,E ro Jalandhar
0361-2 54 36 69, 25138 81 040-27 55 53 83, 27 55 53 93 0181·2 22 12 72 033-22 27 43 84
PUBliSHED IN INDIA BY
0522-2 20 99 16
~ LAXMI PUBLICATIONS (P) LTD 113, GOLDEN HOUSE, OARYAGANJ, NEW DElHI-11 0002, INDIA
Telepho ne: 91-11·4353 2500, 4353 2501 Fax; 91-11-2325 2572, 4353 2528 www.laxrnipublications.corn [email protected]
022-24 91541 5, 24 92 78 69
-
0651-2 20 44 64
C-856 2/014/ 04 Printed at: Reoro lnrlirl 1trl
Mnmh;~i
TO
MY FAT HER
I
Preface
I ,.'
This volwne is one of the two which offer a comprehensive course in those parts y used by of theory and practice of Plane and Geodetic surveying that are most commonl Degree. civil engineers. and are required by the students taking examination in surveying for surveying common more the chapters thirteen in Diploma and A.M.I.E. The first volume covers operations. , Each topic introduced is thoroughly describOd, the theory is rigorously developed General n. applicatio its illustrate to and. a ~rge DUIJ?ber of numerical examples are included invariably given by practical s~atements of important principles and methods are almost to illustrations. A large number of problems are available at the end of each chapter, stage~ illustrate theory and practice and to enable the student to test his reading at differem of his srudies. Apan from illustrations of old and conventional instruments, emphasis has been placed good deal on new or improved instruments both for ordinary as well as precise work. A al geometric the of discussion thorough a with ts of space has been given to instrumental adjustmen principles in each case. Metric system of units has been used throughout the text, and, wherever possible, since the the various formulae used in texc have been derived in metric units. However, g engineerin the ted in all cha~ge\ over to metric system has still nor been fully implemen gi\'C!": system, hdxe ~!so beer: ;;;~:~~Jtirr:~ i;~ •JUr conntiy, a fe·,~- examples in F.P.S. to I should lik.e to express my thanks to M/s. Vickers Instruments Ltd. (successors .. Ltd Watci M/s. Cooke, Troughton & Simm's), M/s. Wild Heerbrugg Ltd., M/s Hilger & ns from and M/s. W.F. Stanley & Co. Ltd. for permitting me to use certain illustratio es Universiti various to due also are thanks My hs. their catalogues or providing special photograp of some reproduce to me pennitting for and exami~g bodies of professional institution the questions from their examination papers. lnspite of every care taken to check. the numerical work. some errors may remain. and I shall be obliged for any intimation of theses readers may discover. JODHPUR 1st July, 1965
B.C. PUNMIA
Jl(
PREFACE TO THE THIRD EDITION
PREFACE TO THE NINTH EDITION
In this edition, the subject-matter has been revised thoroughly and the chapters have been rearranged. Two new chapters on "Simple Circular Curves' and 'Trigonometrical Levelling (plane)" have been added. Latest Indian Standards on 'Scales', 'Chains' and 'Levelling Staff have been included. A two-colour plate on the folding type 4 m Levelling Staff, conforming to IS 1779 : 1%1 has been given. In order to make the book more useful to the ~tudents appearing at A.M.l.E. Examination in Elementary Surveying, questions from the examination papers of Section A. from May 1962 to Nov. 1970 have been given Appendix 2. Account has been taken throughout of the suggestions offered by the many users of the book, and grateful acknowledgement is made to them. Futther suggestions will be greatly appreciated.
JODHPUR 1st Feb.. 1972
B.C. PUNMIA
PREFACE TO THE FOURTH EDITION In this edition, the subjec1-matter has been revised and updated. An appendix on 'Measurement of Distance by Electronic Methods' has been added. JODHPUR 15-10-1973
B.C. PUNMIA
In the Ninth Edition. the subject-matter has been revised and updated. B.C. PUNMIA
JODHPUR 1st Nov., 1984
PREFACE TO THE TENTH EDITION In the Tenth Edition, the book has been completely rewritten, and all the diagrams have been redrawn. Many new articles and diagrams/illustrations have been added. New
instruments, such as precise levels. precise theodolites, precise plane table equipment, automatic levels. new types of compasses and clinometers etc. have been introduced. Two chapters on 'Setting Out Works' and 'Special Instruments' bav~ been added at the end of the book. Knowledge about special instruments, such as site square , transit-level, Brunton's universal pocket transit, mountain compass-transit, autom.nic le~~ls, etc. will be very much useful to the field engineers. Account has been taken througho~t of the suggestions offered by the many users of the book, and grateful acknowledgement is made to them. Further suggestions will be greatly appreciated. B.C. PUNMIA A.K. JAIN
JODHPUR lOth July, 1987
PREFACE TO THE TWELFTH EDITION PREFACE TO THE FIFTH EDmON In the Fifth Edition. the suhiect-matter ha!< on SI units bas been added.
~n
thnrnnQ:hly rP:vic:.,-1
JODHPUR
In the Twelfth Edition, the subject-matter has been revised and updated. An
Appenrli'~'
B.C. PUNMJA
25-4-1978
PREFACE TO THE SIXTH EDmON In the Sixth Edition of the book, the subject-matter bas been thoroughly revised and updated. JODHPUR 2nd Jan., 1980
B.C. PUNMIA
JOlJHPUR 30th March, 1990
B.C. PUNMIA A.K. JAIN
PREFACE TO THE THIRTEENTH.EDITION In the Thirteenth Edition of the book, the subject mauer has been thoroughly revised and updated. Many new articles and solved examples have ·been added. The entire book bas been typeset using laser printer. The authors are thankful to Shri Moo! singb Galtlot for the fine laser typesetting done by him. JODHPUR 15th Aug. 1994
B.C. PUNMIA ASHOK K. JAJN ARUN K. JAIN
fl! - I:!
i SI
!!
X
Contents
PREFACE TO TilE SIXTEENTH EDITION In !he Sixteenth Edition, !he subject matter has been thoroughly revised, updated and rearranged. In each chapter, many new articles have been added. ·Three new Chapters have been added at !he end of !he book : Chapter 22 on 'Tacheomelric Surveying'. Chapter 13 on 'Electronic Theodolites' and Chapter 24 on 'Electro-magnetic Disrance Measurement (EDM)'. All !he diagrams have been redrawn using computer graphics and !he book has been computer type-set in bigger fonnat keeping in pace with the modern trend. Account has been taken throughout of !he suggestions offered by many users of !he book and grateful acknowledgement is made to !hem. The authors are thankful to Shri M.S. Gahlot for !he fine Laser type setting done by him. The Authors are also thankful Shri R.K. Gupta. Managing Director Laxmi Publications. for laking keen interest in publication of !he book and bringing it out nicely and quickly. Jodhpur Mabaveer Jayanti lsi July, 2005
B.C. PUNMIA ASHOK K. JAIN ARUN K. JAIN
CHAYI'ER
I
FUNDAMENTAL DEFINITIONS AND CONCEPTS I
1.1.
SURV~YING : OBJECT
1.2.
PRIMARY
1.3. 1.4. 1.5.
CLASSIFiCATION PRINCIPLES OF SURVEYING UNITS OF MEASUREMENTS
3
1.6.
PLANS
8
1.7. 1.8. 1.9.
SCALES PLAIN SCALE DIAGONAL SCALE
1.10.
THE VERNIER
1.11.
MICROMETER
1.12 1.13
SCALE ERROR
1.14.
SHRUNK
1.15.
SURVEYING -
CIIAYI'ER
2
DIVISIONS
AND
OF
II
12 18
MICROSCOPES
OF CHORDS DUE TO USE
19 OF
CHAPTER 3.1. 3.2. 3.3.
3
3.7. 3.8. 3.9.
3.10. 3.11.
~~~ 4.1.
IN
COMPUI'ED
'1:1 '1:1 28 29 PERMISSmLE
ERROR
RESULTS
3()
31
LINEAR MEASUREMENTS 37 37 38 46
DIFFERENT METHODS DIRECT MEASUREMENTS INSTRUMENTS FOR CHAINING OL-;
S0RVEY
U.NJ;.s
CIWNING MEASUREMENT OF LENGfH WITH TilE HELP OF A TAPE ERROR DUE TO INCORRECI' CHAJN. CHAINING ON UNEVEN OR SLOPING GROUND
49
ERRORS IN CHAlNING TAPE CORRECTIONS DEGREE OF ACCURACY IN CHAINING PRECISE UNEAR MEASUREMENTS
S7
4
so so S4
60 70
70
CHAIN SURVEYING 8S
4.2.
CHAIN TRIANGULATION SURVEY STATIONS
ss
4.3.
SURVEY LINES
8S
"' I .___
21 22
ACCURACY AND ERRORS
RA..'IJG!t-;G
3.5. 3.6.
SCALE
CHARACI'ER OF WORK
ERRORS
2.4.
WRONG
20
SCALE
2.6.
2.3.
s .8 10
2..5.
2.2.
4
MAPS
GENERAL SOURCES OF ERRORS KINDS OF ERRORS TIIEORY OF PROBABILITY ACCURACY IN SURVEYING
2.1.
I
SURVEY
XIII
xn
_;{4 4.5.
LOCATING GROUND FEATURES : OFFSETS FIELD BOOK
4.6.
FIELD WORK
4.7. 4.8.
~.
4.10.
4.11.
/
VCH APTE R
5.4.
THE
5.5.
S.6.
THE SURVEYOR'S COMPASS WILD 83 PRECISION COMPASS
5.1.
MAGNETIC
5.8.
LOCAL
/~R 6.1. 6.2.
6.3. 6.4.
j
6.l. {
6.6. 6.7.
6.8. 6.9.
CHAPTER
PRISMATIC
6
COMPASS
7.2.
CHAIN
7.5. 7.6. 7.7. 7.8.
7.9.
7.10. 7.11. 7.12.
CHAPTER 8.1.
8.2.
9.3. 9.4.
116
9.5. 9.6.
7
124
9.8.
!25
9.9.
142
OMITIED MEASUREMENTS
AND DEPARTURE CONSECUTIVE CO-ORDINATES : LATITUDE OMITfED MEASUREMENTS
144
9.18.
ISO ISS ll6
161
9.21.
METIIOD
162 162
164 16l 167
168 169
_/
10
CONTOURING
-196 197 201
204 211
213 21l
216 216
222
226 230
233 23"? 238 240
244 2"48 2l2
257
10.2. 10.3. 10.4. IO.S.
CONTOUR INTERVAL CHARAcrERISTICS OF CONTOURS METHODS OF LOCATING CONTOURS INTERPOLATION OF COtiTOURS
10.6.
CONTOUR GRADIENT USES OF CONTOUR
10~7.
\.QHAPTER 11
172
11.2.
177
11.3.
i
183
244
10.1.
171
ISO
182
243
UE.i>it:RA.i..
11.1.
179
182
HYPSOMETRY
~
161
OF
LEVELLING PRECISION
THE LEVEL TUBE SENSITIVENESS OF BUBBLE TIJBE BAROMETRIC LEVELLING
9.19. 9.20.
Ill
IN
ERRORS DEGREE
9.17.
181 182
19l
9.11. ~ CURVATURE AND REFRAcriON 9.13. RECIPROCAL LEVELLING AL SECfiONJNG) 9.14. PROALE LEVELLING (LONGITUDIN 9.15. CROSS-SECTIONING 9.16. LEVELLING PROBLEMS
137
PROCEDURE
LEVELLING
DIFFERENTIAL LEVELLING HAND SIGNALS DURING OBSERVATIONS BOOKING AND REDUCING LEVELS BALANCING BACKSIGIITS AND FORESimiTS
'-)kf'(
141
TRAVERSING FREE OR LOOSE NEEDLE COMPASS TRAVERSING AND CHAIN TRAVERSING BY FAST NEEDLE METHOD ANGLES TRAVERSING BY DIRECT OBSERVATION OF TAPE AND IT TRANS WITH LS DETAI LOCATING CHECKS IN CLOSED TRAVERSE PLOTIING A TRAVERSE SURVEY LATmJDE AND DEPARTURE CONSECUTlVE CO-ORDINATES ERROR G CLOSIN BALANCING TilE TRAVERSE DEGREE OF ACCURACY IN TRAVERSING
8
_fl
137
THEODOLITE
TRAVERSE SURVEYING
!!'l'TP0!"!U':'T!0!'J'
7.3.
SURVEY
9
DEANIDONS METHODS OF LEVELLING LEVELLING INSTRUMENTS LEVELLING STAFF THE SURVEYING TELESCOPE TEMPORARY ADJUSTMENTS OF' A LEVEL ING) THEORY OF D!RECT LEVELLING (SPIRIT LEVEL
9.1.
133
THE ESSENTIALS OF THE TRANSIT DEFINITIONS AND TERMS TEMPORARY ADJUSTMENTS GENERAL S MEASUREMENT OF HORlZONTAL ANGLE S MEASUREMENT OF VERTICAL ANGLE OLITE MISCELLANEOUS OPERATIONS WITH THEOD RElATIONS D DESIRE AND LINES FUNDAMENTAL WORK OLITE TI!EOD IN ERROR OF SOURCES
7
~R
109
127
GENERAL
8.7.
110
120
THE THEODOLITE
,
7.4.
COMPASS
DECUNATION IN
9S 98 100
8.l. 8.6.
118
ATTRACTION
ERRORS
8.4.
106
THE COMPASS
5.3.
5.2.
94
lOS
CROSS STAFF SURVEY PLO'ITING A CHAIN SURVEY
INTRODUCfiON BEAIUNGS AND ANGLES mE 'I'HEORY OF MAGNETIC COMPASS
5.1.
92
S INSTRUMENTS FOR SEITING OUT RIGJIT ANGLE ING CHAIN BASIC PROBLEMS IN OBSTACLES IN CHAINING
5
G CASE I ' BEARING. OR LENGTH, OR BEARIN ED OMIIT SIDE ONE AND LENGTH OF G OF ANOTF.HR SIDE OMmE D CASE D : LENGTH OF ONE SIDE AND BEARIN ED CASE m ' LENGTHS OF TWO SIDES OMIIT OMmE D CASE IV : BEARING OF TWO SIDES SIDES ARE NOT ADJACENT CASE II, m, IV : WHEN THE AFFECTED
8.3.
87
.
6
.
'-" 2S9 260 264 266 267
MAPS
PLANE TABLE-SURVEYING
271
ACCESSORIES GENERAL WORKING OPERATIONS PRECISE PLANE TABLE EQUIPMENT METHODS (SYSTEMS) OF PLANE TAD LING INTERSECTION (GRAPHIC TRIANGULATION)
273
TRAVERSING RESECITON
278
27S 27l
276
m
~
',
~'
11.8.
THE
THREE-POINT
PROBLEM:- .
11.9 TWO POINT PROBLEM 11.10. ERRORS IN PLANE TABLING 11.11. ADVANTAGES AND DISADVANTAGES
~
r/CIIAPI'E R 12
"'
""' 279
285
OF
PLANE TABLING
CALCULATION OF AREA
12.1. 12.2.
GENERAL GENERAL METHODS OF DETERMINING AREAS 12.3. AREAS COMPIJTED BY SUB-OMSION IJ'IITO TRIANGLES ~ AREAS FROM OFFSETS TO A BASE LINE : OFFSETS AT REGULAR INTERVALS OFFSETS AT IRREGUlAR INTERVALS ~ AREA BY DOUBLE MERIDIAN DISTANCES 12.7. AREA BY CO-ORDINATES 12.8. AREA COMPUTED FROM MAP MEASUREMENTS
vz.5.
_/ -~--9.
AREA
BY
._,.£HAYfER 13 13.1
PLANIMETER
$
.JYI'/
TRAPEZOIDAL FORMULA (AVERAGE END AREA THE PRISMOIDAL CORRECTION THE CURVATURE CORRECTION VOLUME FROM SPOT LEVELS VOLUME FROM CONTOUR PLAN
__!);..
100 links
6
J..;-::;;:;,:l:~
.A.:iiiiOii~(l,;;:,
; ] 10 decimetres
;!
~
centimetre
I
I
!w I
metres
! 1852 meues I I
I
=
I
6
SURVEYING
FUND~AL DEFINJ"i10NS AND CONCEPTS
TABLE I.Z CONVERSION FACTORS (Mnres, yards, feet and irrch2s)
TABLE 1.6 CONVERSION FACTORS (Ares, Acres and sq. yords)
Metns
Y.gi.b., til,;: n:.ea.surcd W::;~.ance wiiJ be too shan and the correction will be additive. If the absolute length of the tape is lesser than the nominal or designated length. the measured distance · will be too great and the correction will he subtractive.
where
(steel)= a., (L, - Lb)
I:J.T=
absolute length (or actual length) of the tape or wire is not equal to its nominal or designated length, a correction will have to he applied to the measured
I
c,
81=(1±81)a.I:J.T
Then
If the
Ca=~
... [3.8 (a))
Let I:J.T he the nuroher of degrees of temperature change required to change the length of the ta.P" by = 81
Correction for Absolute Length
Thus,
(brass)_ "'a.":•:':--g
... (3.24)
t
Solution. Volume of tape per metre run = 0.08 x 100 = 8 em' Weight of the tape per metre run= 8 x 0.078 = 0.624 N :. Total weight of the tape suspended between two supports = W = 8 x 0.078 x 10 = 6.24 N ,-_
~~uw
~..:orrecnon
2 '1f:(•P!.) 1 r:!!W 2 3 ~- J0 Y (6.2!") -. = 0.004H7 m. - -2 = = or sag= Ls = - - 24 (100)2 24 P 24 P2
Example 3.12. A steel tape 20 m long standardised at 55' F with a pull of 10 kg was used for measuring a base line. Find the correction per tape length. if the temperature ar the time of measurement was 80 'F and the pull exened was I6 kg. Weight of I cubic em of steel = 7.86 g, Wt. of rape= 0.8 kg and E = 2.I09 x IO' kg/em'. Coefficient of expansion of tape per I'F=6.2xio-•. Solution. Correction for temperature= 20 x 6.2 x 10 - 6(80 - 55) = 0.0031 m {additive) (P- Po)L . AE Correcuon for pull3 Now, weight of tape= A (20 x 100)(7 .86 x 10- ) kg = 0.8 kg (given) 8 A= _°6 x = .0.051 sq. em 78 2
. 'I'
[ ,,
J.
,,
1_'1
j
' :il :11
:I 1
I ,
"'i·.I !1
:'I
~
1.1
II" ~! •ii,,6
I I•
I 'I
j
"
I I
70
UNEAR MEASUREMENTS
SURVEYING
20 = 0.00112 (additive) Hence, 0.05! X 2.JQ9 X 106 2 ' 20 Correction for sag= l,(wl,y = llfed, the bearings of the lines can be calculated provided the bearing of
one line is also measured. Referring to Fig. 5.7, let a..~.y.li, be ~.included angles measured clockwise from back srations and 9 1 be lhe measured. bearing of the line
AB.
---M-
./"I ""'-
hJ_/e,
FIG. 5.7. CALCULATION OF BEARINGS FROM ANGLES.
ll4
SURVEYING
The bearing of the next line BC = e, = e, + a - 180' ... (1) The bearing of the next line CD = a, = a, + ~ - 180' ... (2) The bearing of the next line DE= a, = a, + y - 180' ... (3) The bearing of the next line EF =a,= e, + 1i + 180' ... (4) As is evident from Fig. 5.7, (a,+ a), (a,+~). and (a,+ y) are more than !80' while (a,+ li) is Jess than 180'. Hence in order to calculate the bearing of the next line, the following statement can be made : "Add the measured clockwise angles to the bearing of the previous line. If the sum is more than 180°1 deduct 180°. If the sum is less than 180°, add 180° ". In a closed traverse, clockwise angles will be obtained if we proceed round the traverse in the anti-clockwise direction. E~LES ON ANGLES AND BEARINGS c.A(xample 5.1. (a) Convert the following whole circle bearings to quadrantal bearings: (i) 22' 30' (ir) 1700 12' (iir) 211' 54' (iv) 327' 24'. (b) Convert the following quadrantal bearing to whole circle bearings : (i)Nl2'24'E (ir)S31'36'E (ii1)S68'6'W (iv)N5'42'W . Solution. (a) Ref. 10 Fig. 5.1 and Table 5.1 we have (1) R.B.= W.C.B. = 22' 30' = N 22' 30' E. (ir) R.B.= 180'- W. C. B . = 180'-170' 12' = S 9' 48' E. (iii) R.B.= W. C. B.- 180' = 211' 54 -180' = S 31' 54' W. (iv) R.B.= 360'- W.C.B. = 360'- 327' 24' = N 32' 36' W. (b) Ref. 10 Fig. 5.2 and Table 5.5 we have (1) W.C.B.= R.B.= 12' 24' (ir) W.C.B.= 180'- R.B.= 180'- 31' 36' = 148' 24' (iir) W.C.B.= 180' + R.B.= !80' + 68' 6' = 248' 6' (iv)/ W.C.B.= 360'- R.B. = 3UO'- 5' 42' = 354' 18' _;EXample 5.2. The following are observed fore-bearings of the lines (1) AB 12' 24' (ii) BC 119' 48' (iir) CD 266' 30' (iv) DE 354' 18' (v) PQ N 18' 0' E (vi) QR Sl2' 24' E (vii) RSS59' 18'W (viii) ST N86' 12'W. Find their back bearings. Solution : 8.8.= F. B.± 180', using+ sign when F.B. is Jess than 180' ,and- sign when it is more than 180°. (r) B.B. of AB = 12' 24' + !80' = 192' 24'. (ii) B.B. of BC = 119' 48' + 180' = 299' 48' (iii) B. B. of CD= 266' 30'- 180' = 86' 30' (iv) B.B. of DE= 354' 18' - 180' = 174' 18' (v) B.B. of PQ =S 18' 0' W fvl) B. B. of QR = N 12' 24' W (vii) B.B. of RS = N 59' 18' E (viii) B.B. of ST = S 86' 12" E
115
THE COMPASS
Axample 5.3. The following bearings were observed with a compass. Calculale the
interior angles. Fore Bearing Line 60' 30' AB 122' 0' BC 46° 0' CD 205' 30' DE 300" 0'. EA Solution. Fig. 5.8 shows the plotted traverse. .. ,122°0'
'
'
~...'205°30'
'
\,Jj/ FIG. 5.8.
i
Included angle = Bearing of previous line- Bearing of next line LA = Bearing of AE - Bearing of AB = (300' - 180')- 60' 30' = 59' 30'' /D
. 0".,,.;..,,..
,....~
DA
-q.,. .... ;..,., ,..,; rJr
= (60' 30' + 180')- 122' = ll8' 30'. L C = Bearing of CB - Bearing of CD
= (122' + 180')- 46' = 256' LD = Bearing of DC - Bearing of DE = (46' + 180') - 205' 30' = 20' 30'. LE = Bearing of ED - Bearing of EA = (205' 30' - 180') - 300'+ 360' = 85' 30' Sum = 540' 00'.
Check :
(2n - 4) 90' = (10 - 4) 90' = 540'.
~xam.ple 5.4. The following interior angles were measured with a se.aanr in a closed traverse. The bearing of the line AB was measured as 60° 00' with prismaJic compass.
J
117
THE COMPASS
SURVEYING
116
Calculate the bearings of all other line LD ~ 69' 20~ Solution. Fig. 5.9 shows the plotted ttaverse. To fmd the bearing of a line, add the measured clockwise angle to the bearing of the previous line. If the sum is more than 180', deduct 180'. If the sum is less than 180', add 180'. Clockwise angles will he obtained
if we proceed in the anticlockwise direction round the traverse. Starting with A and proceeding to-
if LA ~ 140' 10'; LB ~ 99' 8';
f
(l) Surveyor's compass (2) Prismatic compass (3) Transit or Level Compass. Earth 's Magnetic Field and Dip
*
. "' !
0
N
0
;;
0
;;
0
r;:
0
N
.. "'
"'
~
.. . "'
~
"'0 J:/)., 9o ' 0' to 360' with zero at vernier C. For angle of elevation wilh (b) (a) face left, vernier C reads GRADUATION. CIRCLE VERTICAL OF FIG. 6.11. EXAMPLES 30' while D reads 210' . In !his system, therefore, 180' are to be deducted from vernier D to get the correct reading. However, it is always advisable to talte full reading (i.e., degrees, minutes and seconds) on one vernier and pan reading (i.e., minutes and seconds) of the other.
corrected values for !he first set. Several such sets may be taken by setting !he initial angle on !he vernier to different values. The number of sets (or positions, as is sometimes called) depends on !he accuracy required. For first order triangulation, sixteen such sets are required with a !" direction lheodolite, while for second order triangulation, four and for third order triangulation two.
I
I i
!he horizontal. It may be an angle of elevation or angle of depression depending upon wbelher !he object is above or below the horiwntal plane passing through the trunnion axis of the instrument. To measure a vertical angle, the instrument should be levelled with reference to !he altitude bubble. When the altitude bubble is on the index frame, proceed
as follows :
&oB&> .......
(!) Level the instrument wilh reference to !he plate level, as already explained.
~
I 0
angle of elevation as positive
circle is moved with telescope, it is easy to see how the readings are taken.
ANGLES
----·
Fate: Ri•ht
] ~
D
Angle
Mean
. . .. .
•
0
4(l
Vertical Angle
Average Vertical
Angle
.. ..
.
12 20 -5 12 30 00 40 +2 25 so 7 38 20 7 38 25 +2 26 00
-5 12
A -5 12 20 12 00 -5 12 10 25 20 +2 25 30 7 37
D
.. . .•
"'
4(l
c
Mean
4(l
6.7. MISCELLANEOUS OPERATIONS WITH THEODOLITE 1. TO MEASURE MAGNETIC BEARING OF A LINE In order to measure !he magnetic bearing of a line, the thendolite should be provided wilh eilher a tubular compass or trough compass. The following are the steps (Fig. 6.12):
these operalions.
the algebraic difference betWeen the cwo readings taking
s
c
B +2 25
!he vertical circle. Similar observation may be made wilh anolher face. The average of !he two will give the required angle. Note. It is assumed that the altitude level is in adjustmenl and that index error has been eliminaled by permanenl adjristmems. The clip screw shauld nat be touched during
to
•
Vertical
the object. Use vertical circle tangent screw .for accurate bisection. (4) Read both verniers (i.e. C and D) of vertical circle. The mean of the two gives
and angle of depression as negative. Table 6.4 illustrates the melhod of recording the ·observations. Graduations on Vertical Circle Fig. 6.11 shows two examples of vertical circle graduations. In Fig. 6.1l.(a). the circle has been divided into four quadrants. Remembering !hat !he vernier is fixed while
... ~
Fate:un
(2) Keep !he altitude level parallel to any two foot screws and bring the bubble central. Rotate !he telescope through 90' till the altitude bubble is on the third screw. Bring !he bubble to !he centre with !he third food screw. Repeat the procedure till !he bubble is central in both !he positions. If !he bubble is in adjustment it will remain central for all paintings of !he telescope. (3) Loose !he vertical circle clamp and rotate the telescope in vertical plane to sight
In some instruments, the altitude bubble is provided both on index frame as well as on the telescope. Tn such c~H~~-~, the !n~tn~m