133 105 144MB
English Pages 194 Year 1940
DESCRIPTION OF MANUFACTURE GASE, CARTRIDGE, 37MM. MI6 & MI7
OFFICE OF
THE CHIEF OF ORDNANCE U.S. ARMY MAY 1, 1940
The is
based
57 mm.
upon
and
M16
The preparation facturers
an
of
information the
contained
practice
used
by
herein that
has
been
arsenal
prepared
inthe
at
Frankford
manufacture
of
Arsenal
Cases,
and
Cartridge
M17. information plans
showing
a
for
has the
possible
been
compiled
war-time method
for
use
as
4 guide
production
of
this
procedure
in
the
of
in
item, event
connection
and of
as
an
actual
aid
with to
the
manu-
production
in
emergency. The
cepts
no
processes,
SUBMITTED
Ordnance
responsibility
or
such
either
operations
BY:
in
as
in
furnishing
connection
may
be
the
with
covered
the
by
information use
live
of
contained
recommended
herein,
features
acand
patents.
APPROVED:
W. P. BOATWRIGHT Colonel, Ord. Dept. Commanding Officer Frankford
Department,
Arsenal
C, T. HARRIS, JR. Brigadier General Assistant to the Chief Chief
of
Industrial
of
Service
Ordnance
PRELIMINARY DATE
5-1-40
PLANT | ADDRESS | Plant Hours per Month Gage Design Hours Available — Tool Design Hours Available Toolmaker Hours Available Gagemaker Hours Available —
Present Capacity per Month Production Assigned per Month Deliveries start in
SURVEY
COVER
Revision
Sheet
ITEM, SUB Certridse, &
HL?
of
SHEET
sheets
ASSEMBLY or COMPONENT Case, 57 mm. i116 Drawings 771-2-96 &71-2-100
Based on Production of
perMonth
Tool | Design Hours Required Gage Design Hours Required
eo
Toolmaker Hours Required(lset) 4000 Toolmaker Hours Req'd. (Prod. __per month) _ Gagemaker Hours Required (1 set) _ 1000 Gagemaker Hours Req’d (Prod.
permonth)
,
— =>
Basis — 10 hrs. per day —25 Days EQUIPMENT
SHORTAGES
ARSENAL
REMARKS
Toolmaker Hours listed above do not include the time required in the manufacture of raw or semi-finished materials such as bar stock, forgings and castings. Gages mentioned herein are working gages only. Toolmaker and special tools
gagemaker hours include only and gages. Standard tools
and gages which specializing in
cluded,
gages,
such snap
as
may be procured from firms certain types are not in-
drills,
gages,
plug
taps,
gages,
dies,
thread
etc.
Estimated number of government inspectors required for production of 1,250,000 Cases per month 66.
GENERAL
In
addition
specifications
be
checked
ing
should
enable
dates
In larly
fully
From in due
each
the
all
a
press and
the
proper
the
furnace
over
oxide
method
of
latest
the
the
revised
gages
contractor
case
is
in
contained
should
included
copy.
satisfactorily
and
a
which used
If
the
default
herein
in
be this
revision
of
provided
the
Description
dates
regular
pertaining
with
to
but
check,
If
revised
work
forcing described
order
the
metal
a mandrel in
draw-
the
re-
dimensions
care
produced
and
desirable economy
longer
obtain
each
taken
by
set
up
the
which
drawing
hold
the
as
well
as
may
is
a
certain
the
further
should
size
considerations
that
be
the
within
which
are
to
discussed
punch
and
die
checked
until
the
inspector
cups
are
certain cups
acquire
volatilization Pickling
the
inspection
properties,
necessary
cause
at
see
operation,
grain
is
to
percentage
physical
than
trouble
same
are
be
to
period
cause
there
should
after
period
prolonged
case,
particu-
of
in
the
limits should
the
not
desired zinc,
be
the sucanneal.
left
to
soak
size.
Un-
create
grain
containing
is
each
grain
also
care-
sufficient.
before
after
Recommended
sheets
be
annealed
the
operation.
should
are
undue
sizes
and
sketch
of
necessary
to
necessary
and
the
operation. In
of
should
this
drawing.
the
a set
mind.
up,
pieces
would to
set
in
functioning,
of a
cartridge
bear
Cupping is
for
this
to is
all
It
soaking
the
tools
of
personnel
standpoint
(3) cold
proceed
craw.
the
heavy the
to
After
ceeding
Drawing
manufacturer
centered
(2)
case.
Manufacture,
suit.
for
of
this
is
check,
When
assured
see
manufacture
important (1)
for
of
it
to
the
Description
that
not
changed
be
to
a
do
this
drawings
carefully
should
vision
and
to
INFORMATION
this
to
eliminate surrounding
through
as
description.
expansion it
stated
of
the
either
by
on
drawing
the
primer
drilling or,
seat the
in
hole
using
the
service, smaller method
it than or
one
is is
similar
to
that
CASE,
CARTRIDGE,
37MM.
MI6
CASE, CARTRIDGE, 37MM. MI7
OPERATIONS: 37MM
CARTRIDGE
CASE
MI7
TABLE MANUFACTURE
DEPARTMENT
LIST
OF
EAE
TOS UE CUS SOU
OPERATIONS
CON TRAC TORTS
DRAWINGS
........ GSA
LIST
ts.
OF MACHINES
DRAWINGS
ORDNANCE
OF
See
mLNG 28 Gt ON
CONGR AV OCUR HESSD SOIR ROHR MIAN OUI
.........
besiit
et eae
Fat
agtts
0
=, er A
2.25
Be
ca, -p ee
ee eo
iow
Nicos
Sa
lo
OT
6
ew
dG
dG
CARTRIDGE,
ew
eee
mit on
oe
CASE,
oe oye)
SO
On
a
Cin
oO
oata
6
5
0
DEPARTMENT
s cobTe op
AMO
i
go
0
Ot
dao
Bo
ot
0
(Ge
INSPECTION
GAGES,
GAGE
ETC...
DRAWINGS
1...
.
2...
ee
ww
ATSDR og
aids. ee
eo
eae
Oo
Stee
iol
ree
Cert
Oars ee
ee
tw
ew
tw
poll ats: . Wate
Ck
Get
& M17
tw
L-com
SS
ee
M16
ellie Welediaree
uttee
CRS TOOLS,
37 MM.,
eee
IME
.
FIXTURES,
CONTENTS
EE a
ame
oe ike
een
em
mer
pees
sia
ee
ee
oe aos
s TIM B=96 71-2-100
ens
an Parege Leto
Se
TRB
2
ae
eee
te
tar
Maem
e e
tees ee
we
Page Pages kiem
Perens
cee ew
ee
| Page
7-imGie
8 9 to
12
13
Jocnc) ale
af 2 Yunis ee
FB FB FB
. SoevveOQOwwOwWwOrrrrre
ORDNANCE
OF
OF
11075 17187 17285
to incl.
52351 to 52353 incl. 52355 to 52359 incl. 52361 to 52363 incl. 21725 to 21727 incl. 111721 112908 10785 10786 10112-1 10112-2 10118-1 10118-2
incl.
LIST OF SPECIFICATIONS AMMUNITION, EXCEPT.
ARMS:
OISHS FOR ARTILLERY AMMUNITION | 57-17: IOGE CASES, BRASS, FOR ARTILLERY AMMUNITION | 50-G6-1 Set
METAL2, GENERAL SPECIFICATION FOR THE INSPECTIOWOFDO-M-18/ | $7-178 _| ZINC; SLAB GSPELTER)
loo-2 357 | 57-173
STANP WITH LETTERS AND FIGURES JR
HIGH AND .0/ DEEP7 CALIBER AND OESI6NA: re TION Safes dog pec SIZE & POSITION OF NUMBER: WOT MANDATORY.
=
74
aa
oe
Rah
ERS
aa
= —_ sopard
DIAMETER
PER INCH OF
* eer
aaw
ee
pipe
ft
dir (LY. WHEN A a
papaedten me wp
SRECIPKATIONS REFERRED TOIN THESE SPECIFICATIONS AND NOT LIFTED
L
LENGTH.
REON,
NOT
APPL
493-O/
a
eee
37 /N. Mt tants ane tawk Coomen Oe
y
+66-
STAMP WITH LETTERS AND FiauReS f
WIGH AND .0/ DELP LOT NUMBER
INITIALS
OR SYMBOL
aw
OF MANUFACTURER
4
knee
TEI
AND YEAR OF MANUFACTURE.
si lace
ap
ia en
ere
075-08
ECCENTRICITY BETWEEN
SEREBES
SiRPACE OF CASE ON THE (396OF INDICATOR AMET ER a Codd
TOBE Ac MUST FREELY
ENTER
THE
W-2-96A8
THIS CASE USED IN GUNS M3, M5,77 &T8.
1DGE GAGE CASE
oA gl eo : pa
CHAMBER
os
LLLLILLLLLALLLLLLLLLL ALLL
|
3 | x
re
Slt ea
Fi
eg kd
=
| ‘S874+07
Ae
ok
(4
L447
a,
pa A aa17, | area 2 | 96
revisions
3
2
VIS7777T7K
CASE, CARTRIDGE, 37MM M/I6é
;
8
eos
~
L AA A ee
UNDER REVISION DATE OF NOV.301938:
Seis,
|
S
=
at
SUPERSEDES OLD TRACING H1E-2*96
“ VR.
8y
Deg
Bic i
COO CG IN MORONG OTH PRIMER IN PLACE C-WEIGHT OF CASE, .93L8 APPROX.
SYMBOL
g¥
x2
W777
———
A
LermmmielOR one otrru.e., |
BStOL
Tatas 920402
GUN CHAMBER
Ise
NG Botton SCALE* 2:1
D
]
ORDNANCE
U.S.A
SIZE AND POSITION. OF MOMBERS PND LETTERS NOT MANDATORY.
257004 +079 4+004 = Y,
CAUSED
BY REAPING
i
Ray As |g Vy Io "
on ra
;
a
_—
3 “a
a
4
ASOD
APWRUNITION,
EXCEPT SMALL ARPIS APT,
GEN SPEC
FOR
:
‘ |
'
é
7 "METALS; GENERAL SPECIFICATION FOR INSPECTIONOF e-
|
te
3 3
2. 10 2INC,
as | 00-2-357
|
a
-
st
’
_
>
;
|
CASES,
| 5 COPPER, INCOTS
BRASS,
FOR ARTULERY
APUBIVITION
50-0-7/
]
4
CARTRIDGE
SLAB (SPELTER)
| ececeeeo ears
: | 57-173
g
! |
4
ne
x
|
|
50-de-/
THE SPECIFICATION NUMBERS SHOWN ARE BASIC NUMBERS ONLY. WHEN A SPECIFICATION 1/5 REVISED, A LETTER ($ AFFIXED 10 (TS BASIC SPECIFICATIONS FETEREED TOW THESE SPECIFICATIONS AND NOT LISTED MEREON, SHALL NOT APPL
i
|
os M00 -=005
ee 7
SPEC. nomger
£/57 OF SPECIFICATIONS
2 & 3 CARTRIDGE BRASS DISKS FOR ARTULERY AMMUNITION
|
DN
3
/
§ .
>
T
®
2.
3
NEED NOT BE REMOVED.
Sz78.
3 ‘
CURR
¢
z,
Y 2) =
8n
fe . rs pect
LAG
STAMP WITH LETTERS AND FIGURES # WIGH AND .O/ DEEP LOT NUMBER, INITIALS OR SYMBOL OF MANUFACTURER AND YEAR OF MANUFACTURE.
¥g
3
STAMP WITH LETTERS ANO FIGURES 22
HIGH AND .01 DEEP CALIBER AND OESIGNATION OF CARTRIDGE
{ ROUEN,
BORE 437
INEM
DAME
vy]
TE, MANOREL
SENN DIAPIETIER, FINNEN RENT AND TAREE
FINISH
DAN ON ORE: COACTER APPROX A 2 BACK.
————
-
PERCU
OF LCREIM.
$.86--/
_
+ 714-01
}
~
—--
-
75-02
+
A> ALLOWABLE ECCENTRICITY BETWEEN THE PRIIER nares AND OUTSIDE Sn
CARTRIDGE BRASS.
70 BE ACCEPTABLE, THE CARTRIDGE CASE PST FREELY ENTER THE CHAMBER CAGE.
CLLLLLALLL LLL LLL LLL,
a
a
THIS CASE USED IN MIAZ GUN.
VITTTT7
SUPERSEDES OLD TRACING 7IE-2-100 UNDER REVISION DATE OF JUNE 16,1939.
1004. 005 a
ae
~ 9.30402 GUN
—
725+0/
CASE, CARTRIDGE, 37 MM, M/7 “|
CHAMBER
DRG.
[s)
PERTAINS
I
TO
ORDNANCE DEPT. U S.A.
LIST OF OPERATIONS MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17
1 F.A. Drg.
a 1
OPERATION
i
APPROX
MACHINE
H.p.| ice
Cup
Straight Sided Press, Single Action, Single Crank, Single Geared, Tie Rod Frame, equipped with Dial Feed. 60 Ton Mid-Stroke Capacity. 10" Min. stroke
20
NUMBER
OF
|ESTIMATED
PROD.
MACH.
1 operator 1 helper
| PER...LO._HRs. 13,750
Anneal
&
Pickle
Batch Annealing Furnace with capacity for Basket
30"
x 52"
Washing
x 30"
2 men loperate
high.
& pickling
furnaces
Tanks.
3
4
lst
Draw
Anneal
&
Straight Sided Press, Single Action, Single Crank, Single Geared, Tie Rod Frame, equipped with dial feed. 60 Ton Mid-Stroke Capacity. 12" Min. stroke. .
Pickle
Batch Annealing Furnace with Capacity for Basket 30" x 52" x 30" high. Washing & Pickling Tanks.
20
ll operator 1. helper
71-2-100
JIGS, TOOLS
& GAGES
Operation Sketch Setup Sketch Punch Die Stripper Assembly Stripper Details Gage
F.
A.
FB FB FB FB FB FB FB FB
17187 17188 17189 17190 17191 17192 17193 17194
DRG.
&
12,500
Operation Sketch Setup Sketch Punch Die Stripper Assembly Stripper Details Pin
Same as Operation No. 2
&
16,000
4
i men do pickling shing from 4 furnaces
71-2-96
NAME
Pin 2
Nos.
FIXTURES,
OPERATORS | PER MACHINE PER
5-1-40
16,000
Gage
FB FB FB FB FB FB FB FB
17195 17196 17197 17198 17191 17192 17193 17199
NO.
LIST OF OPERATIONS MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17 = 5
; end
Anneal
&
—
Straight Sided Press, Single Action, Single Crank, Single Geared Tie Rod Frame, equipped 50 Ton with dial feed. Mid-Stroke Capacity.
Draw
14" Min.
6
NUMBER OF
Pickle
20
3rd
Draw
& Wash
lst
Trim
1 operator 1 helper
8,875
Straight Sided Press, Single Action, Single Crank, Single Geared, Tie Rod Frame, equipped with dial feed, 20 Ton Mid-Stroke Capacity.
#DG55
:
16,000
1 operator 1 helper
10,000
No.
20
1.5
Nos.
71-2-96
&
71-2-100
NAME
F. A. DRG. NO. FB FB FB FB FB FB
17200 17201 17202 17203 17191 17192
FB
17204
Operation Sketch Setup Sketch Punch Die Stripper Assembly Stripper Details
FB FB FB FB FB FB
17205 17206 17207 17208 17191 17193
Pin
FB
17210
FB FB
17211 17212
FB
17215
Operation Sketch Setup Sketch Punch Die Stripper Assembly Stripper Details Gage
FB 17193
2
or Equal
Special Automatic Cartridge Case Trimming
Machine. (V & O or Equal)
Same as Operation
5-1-40
FIXTURES, JIGS, TOOLS & GAGES
Pin
Batch Annealing Furnace with Capacity for Basket
(Ferracute
8
|ESTIMATED PROD.
PER MACH. | PER..LO.....HRS.
stroke.
30" x 52" x 30" high. Washing & Pickling Tanks.
7
Drg.
APPROX: | OPERATORS | PER MACHINE
MACHINE
OPERATION
2F.A.
1 operator 1 helper
16,750
Gage
Operation Sketch Setup Sketch
Cutter Length
Gage
FB 17209
FB 17213 FB 17214
LIST OF OPERATIONS MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17
3 FA. Drg.
—
OPERATION
NUMBER OF
a
9
Anneal
&
Pickle
Batch Annealing Furnace with Capacity for Basket
30"
x 52"
Washing
10
4th
Draw
& Wash
&
x 30"
#DG56
Same as Operation
énd
Trim
12
Head
&
Indent
15
71-2-100
F. A. DRG. NO.
16,000
2
1 operator} 1 helper
8,500
or Equal)
1.5
(V & O or Equal)
Knuckle Joint Heading Press, 400 Ton Capacity
with Dial Feed. (Ferracute E401
&
Tanks
Special Automatic Cartridge Case Trimming
Vachine.
71-2-96
NAME
Operation Sketch Setup Sketch Punch Die Stripper Assembly Stripper Details
FB FB FB FB FB FB
17216 17217 17218 17219 17191 17220
Operation Sketch Setup Sketch
FB FB
17223 17211
Cutter Length
FB FB
17213 17224
FB FB
17225 17226
FB FB FB
17229 17230 17231
FB
17232
FB
17233
FB
17234
Pin
11
Nos.
FIXTURES. JIGS, TOOLS & GAGES
PER MACH. | PER....LO._HRs.
No.
high.
Pickling
Straight Sided Press, Single Action, Single Crank, Single Geared, Tie Rod Frame, equipped with Dial Feed, 12.5 Ton Mid-Stroke Capacity.
(Ferracute
|ESTIMA
TED PROD. APPROX: | operators | PER MACHIN E
MACHINE
5-1-40
or Equal)
1 operaton 1 helper
16,750
FB FB
Gage
FB
20
1 operatoy 1 helper
8,500
Gage
Operation Sketch Setup Sketch
Heading Heading
Die Post
&
Bolt
Heading Post Nose Bumpers Rough Dia. Flange Gage Rough Thickness Head Gage Assembly Rough Thickness Head Gage Details
17221 17222
17212
FB 17227 FB 17228
LIST OF OPERATIONS MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17
OPERATION
OPER. NO. 13
Pierce
Primer
Hole
Special Punch Press Single Action, Dial
(Zeh
13A
| (Alternate Drill
Method)
Primer
NUMBER
Hole
& Hahneman
Single
Spindle
OF
|ESTIMATED
Drg.
Mi 3
ai
10,000
Drill
Die
2
& 71-2-100
& GAGES
F. A. DRG. NO.
Operation Sketch Setup Sketch
Punch
or Equal)
71-2-96
NAME
PER MACH. | PER...LO.....HRS.
Feed
Nos.
FIXTURES, JIGS, TOOLS
PROD.
APPROX: | OPERATORS | PER MACHINE
MACHINE.
5-1-40
4 F.A.
& Holder
6,250
operator iO helpers
10,000
Sketch Rack
1 operator nN helper
10,000
Operation Sketch Setup Sketch
17235 17236
FB FB
17238 17239
|FB FB FB
17240 17241 17243
FB FB FB FB FB
17244 17245 17246 17247 17248
FB 17237
Details
1
FB FB
Press, Box Colum, #2 Morse Taper, Max. Distance
Spindle to Table 13" (Allen or Equal), equip-
ped with Double Spindle Drill Head, made by U. S. Drill Head Co. Cincinnati Cleveland Serial #11171. Universal Jig Company.
14
Anneal for and Wash
15
lst
Taper
Taper
Liquid Annealing Furnace, equipped with Pyrometers FB 17240. Washing Tanks
Inclinable Press, Single (Action, Single Geared, equipped with Dial Feed. (Ferracute #CG24 or Equal)
5
of
Die Knockout
Annealing
Rod
Furnace
to incl.
LIST OF OPERATIONS MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17
5 FLA. Drg.
OPER:
OPERATION
NO.
16
end
Taper
approx,
MACHINE
Hp
at
Inclinable Press, Single Action, Single Geared, Equipped with Dial Feed
(Ferracute
#CG24
or
5
| NUMBER
OF
|ESTIMATED
PROD.
PER MACH. | PER 10°... HRS. 13,750
£qual)
Finish Head,
primer
hole
|Special Automatic
trim
ridge
(M16)
&
final
lathe
1.970"
chuck capacity. (Coulter or equal)
Cartdia.
71-2-96
NAME Operation Sketch Setup Sketch
12.5
1
2,750
.
71-2-100
& GAGES
FB FB FB
17249 17245 17246
FB FB
17251 17252
FB
Gage
Operation Sketch Setup
Form Step
&
F. A. DRG. NO.
Die Knockout Rod Inside Dia. Mouth
17
Nos.
FIXTURES, JIGS, TOOLS
| OPERATORS | PER MACHINE
1 operator 1 helper
5-1-40
17250
FB 17253
Sketch
FB
Tool Reamer
FB FB
17254
17255 17256
Trimming Tool Facing Tool Collet
FB FB FB
17257 17258 17259
Stop
FB
17260
GAGES Inside Dia. at Mouth Dia. under Flange Dia. of Flange Thickness of Flange
FB FB FB FB
17252 17261 17262 17263
FB
17266
Thickness Thickness
of Head of Head
(Assembly) (Details
Dia. of Primer Hole Dia. of Primer Hole C'Bore. Length of Primer Hole Boss Depth of Primer Hole C'Bore. Concentricity of Primer Hole
and
1.97"
dia.
(Assembly)
Concentricity of Primer Hole and 1.97" dia. (Details) Total
length
|FB 17264 FB 17265
FB FB FB FB
17267 17268 17269 17270
FB
17271
FB
17272
FB
17273
FB
17274
LIST OF OPERATIONS MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17
NO.I. 17A
OPERATION | Finish Head, Hole & Final (M17)
Primer Trim
MACHINE |Special Automatic Cartridge Lathe (Coulter or Equal )
NUMBER OF
Drg.
|ESTIMATED PROD.
12.5
Nos.
PER MACH. | PER..1O.._HRs. z
2,750
71-2-96
& 71-2-100
FIXTURES, JIGS, TOOLS & GAGES
APPROX: | operators | PER MACHINE a
5-1-40
6 F.A.
NAME
F. A. DRG. NO.
Operation Sketch Setup Sketch Form Tool Step Reamer Trimming Tool Facing Tool Collet Stop
FB FB FB FB FB FB FB FB
17275 17254 17276 17256 17257 17258 17259 17260
GAGES Inside Dia. at Mouth Dia. Under Flange Lia. Flange Thickness Flange Dia. Extractor Groove Width Extractor Groove
FB FB FB FB FB FB
17252 17261 17277 17263 17278 17279
FB FB FB FB FB FB
17265 17266 17267 17268 17269 17270
FB
17271
FB FB FB
17272 17273 17274
FB FB FB
17240 17241 17243
Thickness
Head
Gage
Thickness
Head
Gage
omeep Details)
Dia. Primer Hole Dia. Primer Hole C'Bore. Length Primer Hole ,Boss Depth Primer Hole C'Bore Concentricity Primer Hole 1.97" Dia. Assembly Concentricity Primer Hole 1.97" Dia. Details Total
18
Final Mouth and Wash
Anneal
Liquid Annealing Furnace equipped with Pyrometers FB 17240. Washing Tanks.
1 operator 5 helpers
10,000
Sketch Rack
Length
of
Annealing
Furnace
) FB
17264
& &
to incl
LIST OF OPERATIONS ° MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17
7 FAA. Drg.
OPER NO.
OPERATION
:
19
Low Temperature Stresq Relief Treatment
cycle
Combustion
Equal).
Inspection
21
Stamp
&
Pack
.
Continuous Air heated drawing furnace, one
hour
20
APPROX H.p. |
MACHINE
NUMBER OF OPERATORS
1
(Surface
Corp.
Nos.
&
71-2-100
FIXTURES, JIGS, TOOLS
& GAGES -
NAME
71-2-96
F. A. DRG. NO.
To suit production
or
Bench
Stamping Machine Dial Feed. (noble & Westbrook
or Equal)
|ESTIMATED PROD. PER MACHINE
PER MACH. | PER..10.._ HRS.
5-1-40
To suit production
75
2
8,500
Operation Sketch Setup Sketch
Post,
Stamping
Die, Stamping Holder Shank
FB FB
17280 17281
FB FB FB
17283 17284 17285
FB 17282
BILL
OF
MATERIAL
8 F.A
MANUFACTURE OF CASE, CARTRIDGE, 37 MM., M16 & M17 3
1
2
NAME OF PART
DRAWING
|PIECE MARK
Case, Cartridge | 71-2-96 71-2-100
NUMBER
4
5
NUMBER
PER
NO. CASE
MATERIAL
71-2-96A | 71-2-100A
1 1
|Disc, Cartridge Brass
6 SPEC.
| 57-173
5-1-40
9 8 7 AVERAGE COMMERCIAL FORM OF AMOUNT OF “AMOUNT -| AND A MATERIAL MATERIAL PER |or MATERIAL IMATE SIZE IN THE PER CASE IN [100,000 CASES INROUGH THE ROUGH — |cLUDING 3% SPOILAGE | Disc 3.360"+.008 Dia| 1.225 lbs. -410+.008
Thick
| 126,175 lbs.
CONTRACTOR'S
DISCS:-
It cartridge is
discs
to
OF
is
that
les
will
not
(a)
of
by
disc
cracks
or
seams
are
carried
out
at
one
disc
disc time
at
least
should
be
microscopic
Cupping and After
eliminate ination
cut
as for
case
and
tested
inspector
measurement
the
metal
inspected
manufacturer
inspected
variation for
the
in
tested
also
manufactures
in
his 10%
of
the
5-1-40
the
every
new
which
in
which
the
dirt
and
of
the
brass, As
a
is
run
it
check
Shipment
attention
Discs
those
plant
factory.
Special
thickness.
while
at
brass
dimensions.
the
head,
and.
verifies
of
F.A.
& M17
of paid
thin
thickness
are var-
visually
for
cracks,
seams,
foreign
matter,
or
metal.
the
important
check
the
been
inspected
is
test
been
have
M16
cups.
are in
discs
actual
sufficient
discs
37 MM.,
if
and
9
CARTRIDGE,
contractor's
shop
the
or
It
Should
OPERATIONS: -
the
defects
other
the
have
the
eccentric
cause
Brinell
to
in
provide
All
wise
discs
however,
thickness
to
the
the
received
apt
CASE,
manufacturer,
that
this,
the
any
assumed
brass
assumed
against
MANUFACTURE
INSPECTION
that
the
likely
in
two
examination
discs to
the
have
develop
brass
out of
parts
in
properly
the
drawing
manufacturer's
every
and
should
been
lot
the
of
test
be made
of
brass
taken the
annealed
after
operation. the
by
Brinell
upon discs
the
contractor's
cross
selected
other-
Notwithstanding
plant, the
rolling,
Test.
inspector
For
section.
for
this
the
this
test
From
time
test.
Drawing
the
much cracks,
cupping scale
and
after
seams,
each
drawing
annealing
scratches
or
as any
operation, possible, other
also defects
the to in
case
is
permit the
a
washed
in
quick
visual
metal.
Cases
order
in
to
examwhich
CONTRACTOR'S
INSPECTION
10
F.A.
5-1-40
(Continued ) MANUFACTURE OPERATIONS:Continued
defects
appear
in
subsequent
ed
and
the
are
scratches
the the
constrained die.
The
in
The
wear
the
(b)
of
of
noses
from the
all
when
a new
the
new
and
replating.
dies
are
checked
The
cups
heading
certain
of
is
the
slower
than
on
punches
when
they
checking
the
punches
or
die
should
press
be
is
the
the
used
the
until
to
at
the
they
should
have
metal
piece
not
has
of
made
the
must
the
for should
templates
been
leaves and
wear
be
check-
thickness.
limits
the
corrected
once
wall
the
small
similar
to
of
where
checking
and
is
or
assure
after
certain
be
dies. use
in
be us-
time.
variation
the
die
variation
Templates
time
removed
or
gage
place
for
ground,
from
used,
gaged
takes
dies.
are
pin
operations
within
gages
readily
punch
for
tapering
variable
be
the
gaged
spring
upon
punch
with
are
and
amount
operation
is
can
polishing
dimensions
punches
defect
observed,
drawing,
each
the
& M17
are
limits.
a
placing
unless
M16
scratches
by
the
37 MM.,
in
inspector
wall
thickness
is assured
of
of
the
every
correct
setup.
Heading At
are
time
die,
inspector
coming
working
removed
for
Whenever
case
scrapped
specified
the
CARTRIDGE,
When
cupping,
the
the
checking by
in
on
once
to
spring
considered
ed
time
beyond In
CASE,
operations.
From
worn
at
OF
the
sectionalized
case.
beginning after
of being
the
contract
headed
in
and
from
time
order
to
verify
to
time
during
correctness
of
production, the
cavity
cases of
the
CONTRACTOR'S
INSPECTION
ll
(Continued ) MANUFACTURE OPERATIONS:Continued
(c)
Taper
(d)
and
gaged
One ed
so
as_
to
with
mediately ones
the
taper
for
Finish Machine
cases
CASE,
CARTRIDGE,
37 MM.,
M16
5-1-40
& M17
Draw After
folds,
OF
F.A.
draw,
the
all
inside
Head
and checks
keep
percentage
the
tolerances
stopped
whichever
and
the
work of
beyond
the
adjustments
are
visually
examined
for
scratches,
seams
and
mouth.
from
four
rejects gage
machines
to
a minimum.
limits
made
or
immediately
the
dull
If
machine
tools
the
itis
inspector
which
are
after
produced
replaced
with
machin-
finds them
newly
any is
im-
ground
be.
may
case
the
are at
Trim
inspector
the
cases
diameter
(e) Annealing A periodic
check
annealing
temperatures
length
of
time.
Should
be
checked
are
After for
is made
of
correct
and
each
the
furnace
that
annealing
the
controls cases
operation
are
at
in order being
least
one
to
assure
annealed cup
for
out
of
that
all
the
proper
every
25,000
size.
grain
(f) Stamping The reference
covered GENERAL INSPECTION:
to
by
contractor's the
are
dirt
or
number.
instructions
After They
lot
the
carefully
other
inspector
which
final
in
the
the
stamping
size
of
lots
he should
be
furnished
washing,
examined
defects
The
verifies
all
visually,
metal.
cases both
The
and
pass inside
sharp
the
of
before
corners
out,
and
case
assignment
by the
and
each
of
Government the for
burrs
with lot
must
numbers
are
Inspector.
contractor's dents,
particular
cracks,
be
inspector. scratches,
removed.
CONTRACTOR'S INSPECTION (Continued) MANUFACTURE GENERAL INSPECTION: Continued
At
the
beginning
first
fifty
test,
production
cases
Five 1%
solution
pear
in
the
from
sile
and
are
the
for
as
machine from
twenty
the
seven
& M17
contractor's
cases
for
inspector
test.
are
completely Upon
examination
after
for
microscopic
and
the
periodically
are
shown
of
the
samples.
immersed
must
be
checks
for design
are
to
the
tensile These,
test,
are
for
a
selects,
Pending
period this
the
of
from
the
of
the
results
thirty
test,
proceed
wear limit
to
on
the
gages
gages).
strength together
are
this
by
Each
(See
with to
no
minutes
cracks
are
test.
Five
sample
is
ina
must
ap-
samples
are
placed
Specifications
the
the
forwarded
test
with
tensile
50-46-1.
submitted
cases of
furnished
submitted
of
for
results
contractor discs
Specifications
remaining
the
the
in
tested
the If
used
and
immersion
test.
thereof
11175
contract
M16
nitrate.
cases
case,
twenty
firing
If
FB
cases
the
made
authorizes
Sis
the
mercurous
factory,
the
37 MM.,
suspended.
mercurous
of
each
pulling
graphs
of
CARTRIDGE,
5-1-40
case.
Two cut
CASE,
completed, is
of
of
OF
12 F.A.
results
Government to
the
of
the
tensile
Inspector.
the
a
ten-
50-46-1).Micro-
Government
satisfactory,
in
test,
If
satis-
Proving
Ground
Government
inspector
production.
the
contractor,
Government
a
report
Inspector.
by comparison
with
limit
The
of
the
chemical
contractor's
check
gages
analy-
inspector
(See
Drawing
GOVERNMENT
MANUFACTURE
witnesses
The
Government
all
tests
He material
or
operation
carried
should
pass
incorrect
to
see
that
the
to
the
nished
by
made
size
the
the
are
cases After
the
Government
cleanliness
and
cases
the
size
In and
a lot
of
thoroughly
shop
once
of lots
the
size
contractor,
of
cases
should
the
compose a new
contract
of
lot
number
finished inspector.
then
gaged
with
check
cases
be
is
Specifications
up
on
all
57-173
and
operations,
His
representative
and
furnished
he
must
desired
governed
different should
by
lots start
followed
manufactured. the
and
lots
it
will
5-1-40
M16 & M17
50-46-1.
He
should
reporting
witness
the
any
bad
stamping
stamped.
of finished
assembling finished
familiar
contractor.
correctly
the
13 F.A.
37 MM.,
inspector.
periodically
to
being
process,
CARTRIDGE,
contractor's
determining
contractors
consists
the at
manufacturing
cases
particular
to
of
different
in
finished
loading
be
out by the
through
numbers.
ammunition
general,
is
lot
must
practices
He determines relative
inspector
OF CASE,
INSPECTION
use
the
contractor
judgment.
to
have
lots
the
size
of
of
finished
with
the
by a dash
From as
the
and
large
lot
of
cases.
change.
with
the
If
The
the serial
point as
of
view
possible.
discs. any
lot
information
Discs
material
number
number
of
In fur-
change a
of the
of
lot
lot
of
of
; cases They
with
all
have are
been
inspected
carefully
gages
shown
examined
on
the
by
the
contractor's
visually
Government
both
Inspection
inspector
inside
Gage
and
List.
they
out
for
are
submitted
defects
and
14 FA. 5-1-4090 —
Ss
T
°
R
A
G
~206*
E U
1
[3] :
ato wos
zie
oN
%
SHIPPING
E
N
f]
is]
{
eae
=
ys
a
°
=
WOMEN'S
«
ROOM
WASH
[« |
TOOL
WASH
*b
os=
wens
re]
°
©o
ROOM
ROOM
=
|
ae
|
Se,
Eis
se
ORD. DEPT. U. S.A
FB
17234
PRED +
.,
DETAILS
T
HARDEN
=
GAGE FOR ROUGH THICKNESS HEAD TRACER
eyo
OPERATION fixture
as
At head a
the
and
show
one
to
Cases
escape
from
are
suspended
tapering,
therefore,
annealing. suspended at
each
The from
FB of
the
indexing
an
using
press
punch
a
on
performed
the
same tanks can
hase
in
rack and be see
press
equipped
two
cases
at
a
so
great
as
the
piercing
drilled
at
not
is
during the
drill
drill
hole
the
operation,
a
primer
from
a monorail
to
production
Case
washing
succeeding
contract
fixture
rough
is
operation
17236
the
except
The
emergencies.
air
Drg.
indexing
satisfactory
in
on
beginning
double
this
Arsenal
Frankford
At
NO. |3
is
washing racks
used shop
in
and so
used
liquid
or
pierced
is
in
time
annealing
as the
to
furnace
conveying
and
on
Page
13.
double
was
used.
time
are
placing
in the
allow
the
follow.
The
to
the
open
before
line racks
so
is used
still
that
anneal
operations
drill
method
itis
but
this
spindle This
operations
partially
washing
annealing
layout
with
that
where
end
and
for
PERTAINS TO DRAWING NO.| PIECE MARK) REV. DATE
FH th HES
after
a hoist required
R-271-1K
revisions CASE, CARTRIDGE , 37MM., MI6 &MI7 OPERATION:PIERCE PRIMER FRANKFORD ARSENAL
MAY
HOLE I, 1940
capt? oad, ee ar pro TRaceR WG.
Type anew
monuss(F BITZ35
HOLDER
}
6 aR
6
OF
PERTAINS TO
DRAWING NO. | PIECE MARK | REV. DATE =5— 396A =T8im25 1Q0A__|4-
CASE, CARTRIDGE, 37 MM., MI6 & MI7 OPERATION:- PIERCE PRIMER FRANKFORD ARSENAL
MAY
HOLE
I, 1940
oA Lend ee He EY monusa|
BIT2Z36
STAMP:-FB 17237
ea
cous
i
% |
/ 4 SHANK
|
16 8 R: v7,
pt
3
TO
SUIT
PRESS
PUNCH
PERTAINS TO DRAWING NO.| PIECE MARK | REV. DATE 71-2-96 | 96A |4-18-40)
TOOL STEEL HARDEN
71=2-100!
100A | 4-18-40}
R-271-23A REVISIONS ICASE, CARTRIDGE, 37 MM., MI6 & MI7
PERATION:-PIERCE FRANKFORD ARSENAL
SUBMITTED a
ly
ge sh.
ORD. DEPT., U. S.A.
PRIMER HOLE MAY 1940 FOR ro] 1, ee CHECKER | CHECKER
FB
LAG
17237
FOR .25 FLAT HD. SCREW, 4 HOLES, LOCATE FROM MACHINE
so L
a
sn bch
E
£ z
© ©
:
Ww
;
=o
FIT TO
;
;
a” I
IN CASE
SPOT FOR .25 “V" POINT SCREW, 2 HOLES, LOCATE FROM HOLDER
DIE
33 Crp
BOSS
TOOL STEEL HARDEN
i
|
4
PLATE, STRIPPER TOOL STEEL
PERTAINS TO DRAWING NO.| PIECE MARK | REV. DATE
7i-2-96|
96A
14-18-40
[7I-2-100!
100A
|4-18-40)
R-27I-23¢ CASE, CARTRIDGE, 37 M.M., MIG & MI7 OPERATION:-PIERCE PRIMER HOLE FRANKFORD ARSENAL
MAY
|, 1940
ole? Did, x a mmcult
Oli ooo
STAMP:-FB 17239
—
z
a= s2— +003 Pann t ao ix Hat
th
| ' oS
EP 5g
4H
Fy
= 33
STRAIGHT Vi
ve
;
I,
\
R.
Pra
‘a
I.
2:
48°
.
drat
Two sioes
| 4 38
i
NY
isi
=ti3
NO UNDERCUT
—ik
LOCATE SLOT ON RIGHT SIDE WHEN DIE HOLDE IS TIGHTENED IN PLACE. OTE:1.4950 & .875 DIAMETERS ARE TO BE CONCENTRIC WITH EACH OTHER.
ao
|
3x
|
_
y
2
}——-—-_
4
=
o52oO
\g
sidie
.25-20NG-2 TAP 2-HOLES
a
Bey oe
L ee
Ss
—
}
3
Ig
i
02
a
2)
i?
18
ex
10.852
PERTAINS TO
bp il RENT \
¥ 7
DRAWING NO.| PIECE MARK | REV. DATE
2-96 | 96A
71-2-100
|4-18-
OOA 14-16-40}
R-271-238
REVISIONS IGASE, CARTRIDGE 37MM., MI6 & MI7 ,
HOLOER,_DIE TOOL
2-SCREWS, HOLLOW
OPERATION:- PIERCE
STEEL
HARDEN SET, "V" POINT,
.25-20NC-2
X 375
LONG
Ma
|
eLep no. ferr..u. $.
vi
HOLE
MAY 1, 1940
FRANKFORD ARSENAL SUBMITTED CAPT.
PRIMER
DRAFTSMAN
A
ORD. DEPT., U. S.A.
CHECKER
AAS CHECKER | CH’F OR’
FBI7239
37MM. CARTRIDGE CASE ROUGH DRILLING PRIMER HOLE
a isa
eas
TO
AIR
HOIST
ANNEALING SALT
Wewes
tie
!
}
SS NTA
RACK
PETER
OR
EQUAL
=
=) By
N
NIK
sas
S
EXHAUST
GAS
OUTLET
FIRE BRICK
Se
SS
BSS
resen \
SBA
SSS
TSSES
SERSSSSE
| nO
POLISH
61
rl
POLISH
We AVL, } \ BS
dh 3y
>
LES
x 45° B
gs am
ome
i el
xXsf Ndr,
5.72 —-.0l
PERTAINS TO DRAWING NO.| PIECE MARK | REV. DATE
7I=2= DIE
TOOL STEEL HARDEN
REVISIONS
4-18-40) A 14-18-40)
R=-27i-25 CASE, CARTRIDGE, 37MM.,MI6 & MI7 OPERATION:- FIRST TAPER FRANKFORD ARSENAL SUBMITTED CO
oa”
Nb
v. ¢ A
wm vrusa(
MAY |, 1940 DRAFTSMAN | TRACER FDA.
[ya"
Lie
vee
BITZ4-7
.
|
|
ce
FIT TO CASE
STAMP:-FBI7248
O5R.
Ls
=
388 i
iZ YL Ds
ss
ea
28
oe
==
oe —
-
;
275
| ke,
(s ROD, KNOCKOUT TOOL
=y PERTAINS
STEEL
TO
DRAWING NO.| PIECE MARK | REV. DATE 4-18-40) -2-
HARDEN
1=3=100
100A 14-18-40}
R-271-26
REVISIONS | CASE ,CARTRIDGE, 37 MM.,MI6 &MI7 OPERATION:-
an
sae
FIRST & SECOND TAPER
FRANKFORD ARSENAL SUBMITTED
MAY |, 1940 DRAFTSMAN | TRACER
CALford)
chet
Mee
Fos
BGAL
ORD. DEPT., U. S.A.
Seon
|e
[Rp
RN ies =
FBI7248
6.03 gy
1.28
Z
LR.
Me,
3
5
;
7
&
3
-
°
e
5
OPERATION operation
hi
IR.
g
This
2
2(oe)
is
performed
in
the
same
NO. I6 manner
as
operation
No.
15.
PERTAINS TO DRAWING NO.| PIECE MARK
REVISIONS
R-27I-1M | CASE, CARTRIDGE , 37 MM.,MI6 &MI7 OPERATION:-
FINAL TAPER FRANKFORD ARSENAL
MPOe
CAPT.
ded, ORD. DEPT., U.S. A.
MAY
|, 1940
DRAFTSMAN
‘TRACER
4
H.VG. Of CHECKER | CHECKER |cH'F
FBI7249
;
SECOND TAPER 37 M.M. CARTRIDGE CASE
Ww
be = |
S
°o a
2
w
o
i=)
°o
BOLSTER
a
4 =
bs Oo
SECTION -A-A
2 > a
|
PERTAINS TO DRAWING NO.| PIECE MARK | REV. DATE
REVISIONS
2-96!
96a
la-I
I-2-100|
IOOA
|4-i18-
CASE , CARTRIDGE ,37MM.,MI6 & MI7 OPERATION:-SECOND TAPER
FRANKFORD ARSENAL NOTE :FOR TOP VIEW SEE DRG. FB 17245
4
‘SUBMITTED
wxsor.as|F
MAY 1, 1940
ARH"
ORE |
BIT250
12 AIR VENTS ON THIS SIDE
oT
4 EACH ON OTHER SIDES, EQUALLY SPACED-{TOTAL=20)
i
HOLDER
|I| 2 }]
| | i
]
ial
; PERTAINS TO DRAWING NO.| PIECE MARK | REV. DATE
| |
71-2-96|_96A _|4-I671-2-100]
| IH Vy
100A
|4-18-40 |
tH REVISIONS
CASE, CARTRIDGE, 37 MM.,MI6 &MI7 OPERATION:- STAMPING
SETUP
SKETCH
MAY |, 1940
FRANKFORD ARSENAL SUBMITTED 2
CAPT. __ ono.
ZU. S.
ORs
A.
FBI728|
STAMP:-FB 17282
lagiL z
25-20NC-2 TAP X |. DEEP,
%6
2 HOLES LOCATE FROM MACHINE
9% 5. HARDEN \ Va he aR
Linen
[—— 2 J
miet
ff
Wwf4
=a BE ciara
.
l,
Nio Se
38 a) a
-
!
SO FIT TO BOSS
IN CASE
“—3l2-24NF-2 TAP X 625 DEEP, 2 HOLES, LOCATE FROM MACHINE
T 2
PERTAINS TO DRAWING NO.| PIECE MARK | REV. DATE
SIX— TOOL STEEL HARDEN END
7il-2-96| 96A 71- 2-100 100A
|4ae-a6|
R-271-40 REVISIONS
CASE, CARTRIDGE, 37M.M., MIG & MI7 OPERATION:— STAMPING FRANKFORD ARSENAL cat ¥?
Ps vers.
MAY ‘ae
|,
1940 ae
oe
eeu oie Be
STAMP:-FB 17283
STAMP.
(BODY)
TOOL STEEL HARDEN
wen — 6 INSERT INSERT FOR FOR MI6 MI7 CASE CASE —"7"
LETTERS & FIGURES TO MAKE IMPRESSION 125 HIGH & .O! DEEP ON WORK
Zip.
ah
:
ajal eae es
LETTERS & FIGURES TO HAVE SHARP CUTTING EDGE
ENLARGED
2
SECTION
THRU
LETTERS
23RK?
deka
STAMPING
AS APPEARS ON CASE LETTERS & FIGURES TO MAKE IMPRESSION .093 HIGH & .O! DEEP ON WORK
PERTAINS TO
DRAWING NO. | PIECE MARK | REV. DATE 71-2-96| 96A_ /4-' 71-2-100| 100A _ |4-
INSERTS. TOOL STEEL HARDEN REVISIONS
NOTE:MAKE ALL INSERTS SPACES MARKED ®
R-271-38A CASE, CARTRIDGE, 37 M.M.,MI6 & MI7 OPERATION:- STAMPING FRANKFORD ARSENAL
SAME TO BE
SIZE OVERALL CHANGEABLE INSERTS
Foe
CAPT.
Aforf
MAY a. |
|,
1940
cores | a cHOxER
| cnecKeR
[Oe
CHF DR'SMAR,
siviccyin tt eet eee
STAMP:—FB 17284
ie
4
Z
aa am
'6
—_—
—_
Ralies mane
ie™
>t
¢
neN
J.
Z
=)
a
|
F
|
ae sreaZzk NS
bach
la
—y
Wi eae 3
ma)
ORE
We
TH
[
bette
are
|
it
Ht
COMPONENT DRAWING NO.
GAGE DATE
DATE
T1E-2-100 |F- 6 Bb-| 6-11-28 7!-2-100 '71-2-96
“I+ c
REVISIONS
|9-11 -39 |8-3-39 [9-30-39
+
NN|
GAGE LIST B-///72/
6-112908
‘
ine all | STAMPNOT
60.095
na,
“STAMP MARKING. 5.
DRAFTSMAN | Me.
SNAP_GAGE. TOOL STEEL.
TRACER
U'D'G DRAFTSMAN
CLC. | CLC. On
| G77
i CHIEF DRAFTSMAN
Ags
FINISH f #1 O/- HARDEN.
. DEPT., U. S. A. co ANDING.
APP’ avai
4-164-36Nf-2 x 2 FUL HO. SCREWS.
CHIEF Va
SECTION
FRANKFORD
LAP XY SURFACES. ROCKWELL HARDNESS o> a 66 REMOVE ALL SHARP E
@RD. DEPT., U. S. A.
ARSENAL
DATE JUNE//, 1926
A-92302.
MARKING:~ 37 MM.
Mee WIDTH
EXTRACTOR
+. 1505 5
St
45-0" 15 STAMP=> GO .
fee
J
me
re
GROOVE,
INSP.
REVISIONS |
__ COMPONENT
DRAWING NO. 7l-2-100
;
vi
5°-1°
1600 _| -.0003
z rs u
GAGE
DATE |9-30-39
DATE {9-11-39
DRAWING PERTAINS TO
B ui72l
:
b
a
Let
MIT7,
MARKING
¥Z. Ee
STAMP
3
CASE,
ORD, DEPT., U. S. A.
A52353
2
CART.
“100.
"
2
_
DRAFTSMAN
TRACER
L'D'G DRAFTSMAN eee
WF. | WF. CHECKER
- STAMP=NOT GO .I16
GAGE LISTS
CHECKER
| A? —e
o re
CHJEF
DRAFTSMAN
lees A.
SUBMITT
TEMPLATE GAGE TOOL STEEL
FINISH x - HARDEN
Wy
ppm MAJ.,
SUPERSEDES A52353, REV.
DATE -9-30-39
ORD. DEPT. U.S.A.
FRANKFORD ARSENAL
ROCKWELL HARDNESS C63 TO 66. | DATE JUNE II, 1928. LAP fg SURFACES
REMOVE ALL SHARP
EDGES
A52353
MARKING:— 37M.M. CART.CASE, MI7 &MI6,7!I -2-l00 & 7I-2-96, THICKNESS WALL AT MOUTH, INSP.
, ORD. DEPT. U.S.A.
A52355 __ APPROX.
2 SPHERICAL
>
ag
SEAL AFTER
8
CATE
6-11-28
8-30-34,
STAMP
DRG. PERTAINS TO B72] GAGE LISTS Bil2908
MARKING
60.03
NOT G0.026
TRACER
|UDG, DFTSMAN]
Pron a
rire
ee
co
ew 7
rah
o
NaniMAN
y ai v
SNAP GAGE
GAGE DESIGN MODEL MC
OF'TSMAN]
a@P_\ ¢P
ni—-
ADJUSTABLE
9-30-39 |
8-3-39
ACCEPTANCE.
STAMP:-
AMERICAN
GAGE
DATE
E2400). 3-26-26 7l-2-96
| ,
DRG. NO.
3-30-34 7I-2-100 9-t-39
2g Sg 83 r
REVISIONS COMPONENT
STANDARD
CHIEF GAGE SEC,
ORD. DEPT. u, 5. A.
FRANKFORD ROCKWELL
HARDNESS C63 TO66
LAPX9 SURFACES REMOVE ALL SHARP
EDGES
ARSENAL
DATE JUNE!) 1928
AD2355
MARKING:— 37 M.M. CART. CASE, MI7 & MI6, 71 -2-100 &7I-2-96 DIA.PRIMER HOLE, INSP, A52356
REVISIONS COMPONENT
GAGE
DRAWING NO.
, ORD, DEPT. S. A.
DATE
DATE
71 -2-100 | 9-11-39 7l-2-96 |8-3-39 LARGE
te
TAPER .006 a
STAMP . MAX..551
PER INCH ON DIA. =01 .
\
DRAWING
STAMP
ms
x
cr.
MARKING
TAPER AMERICAN
PLUG
ae
Be
¢z 8
os
GAGE
PERTAINS
Bul72i
.5491+.0001 AT STEP
£
|9-30-3
END .5510-.0001 DIA,
TO
GAGE LISTS
6112908
HARDEN
DRAFTSMAN
TRACER
E.R.G.|
E.R.G.
L'D'G DRAFTSMAN
CHECKER | CHECKER So Bia
°K Dl AN.
aml
SU
GAGE DESIGN STANDARD EXCEPT AS SHOWN
+
APPROVED
ORD. DEPT., U.S. A.
BY ORDER OF THE a F OF ORDNANCE
MY Mey, MAJ.
ORD. DEPT., U.S. A.
FRANKFORD ARSENAL ROCKWELL
SUPERSEDES
A52356
UNDER
REV.DATE 9-30-39
HARDNESS
C63
TO 66
DATE JUNE 11,1928.
EDGES
AS52356
LAP fg SURFACES
REMOVE
ALL SHARP
* Soe +0002
MARKING:- 37M.M. CART. CASE, MI7 & MI6, 71 -2-100 & 7i-2-96, DIA.PRIMER HOLE C'BORE, INSP. AS52357 ORD. DEP'T. U.S. A.
REVISIONS COMPONENT DRAWING NO.
é
STAMP aan
DATE
7/ -2-100\ 3-26-26 -| 6-11-28
N
N
GAGE DATE
3-30-34 |B-30-34 7l-2-96
9-11-39
|8-3-39 |9-30-39
A
SOF *
f
+
t
STAMP:- 60.63
\
GAGE List B-///72/
02 MAK. CHAMFER. STAMP :-NOT 60.634
BIl2908
PLAIN PLUG GAGE: AMERICAN
GAGE DESIGN STANDARD, HARDEN.
DRAFTSMAN
CLC
CHECKER
M64
mee
Be
CHECKER
DRAFTSMAN |
| CHIEF DRAFTSMAN
|\Cmw | LF twa tk
ee Ay,
seg
A,
tn,
MAT
g eee
CHIEF GAGE SECTION ORD. DEPT., U. S. A. FRANKFORD
ARSENAL
ROCKWELL HARDNESS C63 TO 66
DATE JUNE I], [928
REMOVE ALL SHARP EDGES
A-523957.
LAP $9 SURFACES.
MARKING:-
MI7,
STAMP=GO 187
de
STAMNOT P:GO
37M.M. CART. CASE,
REVISIONS
7I -2-100, DIA.EXTRACTOR VE id INSP, ,
$
poner DRAWING NO.
1-86" 22358 . ORD. DEPT, U. S. A.
DATE
3
jo
$4Z4/
16
3-30-34| 8-30-34
3
3
nn
oS
|
|
a2
13-017
7G uy "SEAL AFTER ACCEPTANCE.
WH
iL gore
f
Ly
res!
EET
iss
i
HE
DRAWING
"
3
“
B-111721
2 3 i
=.
i
13
‘iN
LL
__|
if
:
1 H
Ay
Ne
1
Hib}
rh a) aoe’ ,
|
Pipa ~SPACER U
a
PERTAINS
TO
GAGE LISTS
STAMP. MARKING STA CH.
sia
STE. fod
FINISH
bys
CHECKER
CHECKER
Abd | Cnw
gi
‘‘
Sut
38
SNAP GAGE
9-11 -39) 9-30-39
OR G4 FIL. HO. SCREWS. oe ZF
eal
Hig (iL ALTEmy aN “tes m et il.
DATE
7) _-2-100| 5-26-26| 6-11-28
38
2
—
APPROVED:-
TOOL STEEL( EXCEPT SPACER) FINISH £-HDN.
|4F
leat ;
LO ZL “(
GAGE SEC., ORD. DEPT., U. S. A.
FRANKFORD ARSENAL FOCKWELL
C63
LAPS9. SURFACES
70 66
REMOVE ALL SHARP EDGES
°
vept., brs, COMMAND!
( CHIEF,
4 ~.1G4-36NF2* 3 FIL-HD.SCREWS
| CHIEF DRAFTSMAN
D:-
Creoupkoy
16
—
DATE :-JUNE }|-1928
A-5 2 458
MARKING:— 37 M.M. CART. CASE, MI7 &MI6,71 -2-lI00 & 7I-2-96, TOTAL LENGTH, INSP
A52359
STAMP=-MARKING
COMPONENT DRAWING
, ORD, DEPT., U.S. A.
NO.
DATE
71 -2-100 [9-11-39 71-2-96
ere
GAGE DATE
|8-3-39|9-30-39}
nl—
STAMP-NOT GO 8.73. STAMP-GO 8.75
REVISIONS
rm
xz 7.
mall
Se
Fg
; 24
oe
si $
\_|
=
}
:
ors
ee
[
=
S
D4
%
SEAL AFTER
=
ba
ACCEPTANCE
}
5
LY
pas
BH
—
|
it
PL 2
‘
Th pete
mnie
cle Step
se
in
ae Oe
IN
ria SNAP
iH H
i
i
6s
GAGE
d
na
4
STEEL—FIN.Y
(3)-MAGH. STEEL — FIN.“
rie |
Pei
_A52359
REV. DATE
CHECKER
CHECKER
CHJEF
50
DRAFTSMAN
c% SUBMI
-_
ORD. DEPT., U.S. A.
}
—
ono
BY ORDER
OF THE
EF OF ORDNANCE
My typi
HDN.
MAJOR ond. vert. U.S.A. FRANKFORD ARSENAL
(@)—4-4-28nF-2xZ FIL. HD. SCREWS | SUPERSEDES
L’D'G DRAFTSMAN
rT
#4
|
TRACER
}
(1)-TOOL STEEL —FIN * HON. TOOL
DRAFTSMAN
| MH.E} M.HE.
-lo
\
IZ
oo
i wy
hi.
DRAWING PERTAINS re
SOE
»
iLor,s HOLes—4
pes
=
re
—I@
FORLFIL.HD.SCREWS|
8 3
t- -- +
j H
io
rm|oo
os
ae
J
|
|
4}
yd
9-30-39
ROCKWELLHARDNESS C63 T066 LAP fg SURFACES
REMOVE
ALL
SHARP
EDGES
DATE JUNE II, 1928
A52359
MARKING:. 37M.M. CART. CASE, MI7 &MI6, 71 -2-100 & 7i-2-96, DIA. OF MOUTH,INSP A-52361 WN
N
$s;
8
a
N
o
SS
, oRD. DEPT, U.S.A.
9°
HARDEN
: )
STAMP MARKING
{ fs
; J
STAMP:
B-107 21
DESIGN
GAGE LISTS
|
CHECKER
| CHIEF
|Gw4s lee
DRAFTSMAN
SUBMITTED:
WA
a
PLUG GAGE(PROGRESSIVE) GAGE
TO
ORAFTSMAN| TRACER | L’D’G DRAFTSMAN LAY. | LAY.
NOT GO)-43
Ad AMERICAN
PERTAINS
B-112908
CHECKER
PLAIN
|8-3-39/9-30-39
DRAWING
\
f
i
COMPONENT GAGE DRAWING NO. | DATE DATE Tl -2-100} 3-26-26] 6-11-28 9-11-39 7I-2-96
xX 45° CHAMFER 16
ae
REVISIONS
STANDARD
LT-COLQAD.
DEPT., U. aed S. A.
APPROVED:-
hig
FRANKFORD
ROCKWELL
HARDNESS
LAP f7. SURFAGES
REMOVE
ALL
SHARP
C63-66 EDGES
C., ORD. DEPT., U. S. A.
ARSENAL
DATE: JUNE-11-1928
A-52306!
MARKING:—
-37MM. CART. CASE MI6, 71-2-96, DIA. FLANGE, INSP. A 52362
SEAL AFTER
, ORD. DEPT. U.S.A.
ACCEPTANCE
REVISIONS COMPONENT DRG. NO.|
GAGE
DATE
71-2-96|8-3-39
DATE
|9-30-39
DRG. PERTAINS TO Bll2908 GAGE LISTS
2.1700 +.0005
SYMBOL
2.1900 -—.0005
ogee
D'FTSMAN
TRACER
PUG. | Pu.G.
CHECKER
L'D'G.
MAN
D*
Re
CHIEF, ‘hk .
.
suB . U.S.A.
ADJUSTABLE AMERICAN
SNAP GAGE.
GAGE DESIGN MODEL A
STANDARD
ROCKWELL C63 TO 66 LAP“7 SURFACES REMOVE ALL SHARP EDGES
APPROVED BY ORDER OF THE W/ 7 CHIEF OF ORDNANCE N, ; Ltt
toro. DEPT. U.S.A.
FRANKFORD
ARSENAL
DATE SEPT. 30, 1939.
A52362
MUST BE IN LINE.
7l-2-96, & 7I-2-100, LENGTH
A
52363
PRIMER BOSS,
INSP
| ORD, DEPT, U.S. A.
COMPONENT DRAWING
GAGE
NO.
DATE
DATE
7l-2-96'8-3-39 7I-2-100 {9-11-39 |9-30-3
STAMP=-MARKING STAMP=-GO .39 .3700+.0007. -
| ° 1e*x45
ore 4
L 4 %,
DRAWING
ee nN
a
6100
4
ee
a.
PERTAINS
Bil2908 Bili72l
L— Y~.
DRAFTSMAN
TRACER
Pv.G.|
STAMP-NOT GO .37
CHECKER
L'D'G DRAFTSMAN
MHLE. | 347 CHECKER
oo
+-.3894-.0010
TO
GAGE LISTS
4
CHIEF
JET
DRAFTSMAN
Wh
SUBMITTED-
1
25
APPROVED
SNAP
GAGE
SU
TOOL STEEL FINISH “ HON.
ORD. DEPT., U.S. A. BY ORDER OF THE OF ORDNANCE
fp MAJOR
orb. pept..u.s.a.
FRANKFORD ARSENAL ROCKWELL
HARDNESS C63 TO 66 LAP fg SURFACES REMOVE ALL SHARP EDGES
DATE
SEPT. 30,
A 52363
1939
NOTE=PIN TO BE FLUSH WITH STEPS FOR MAX. & MIN. POSITIONS TO SLIDE FREELY WITHOUT SIDE PLAY.
MARKING :—~37MM.CART.
&
& MI6,
CASE
MI7
DEPTH PRIMER HOLE C'BORE, B21725
a
.083
ay
sTamp-MAX.
REVISIONS
7 1-2-100 & 7I-2-96,
INSP
ORD. DEPT, U.S.A.
|_ MAX. 0830 -.0002 MIN. 0790+.0002
Leesa
=
wtsasbelacacllane
Bate
cxshl
71_-2-100|9-11 -39 7I-2-96 |8-3-39 |9-30-39
STAMP -MARKING
FLUSH PIN GAGE ASSEMBLY tt
FOR 4/0 (.109) 9
8
ee + 4
a
-625
SLIDE
FIT
FOR
TAPER PINORIVE
i
r
2x 45°
Sauer
SEE ASSEM.
A. DEEP + DRILL, 3,
SLIDE FIT IN BODY
g
GG a7
1
a
|
DRAWING
KS WwW
BODY
FINISH
OLD TRACING
B21725
UNDER
L'D'G DRAFTSMAN
FFs
| CHECKER
F DRAFTSMAN
‘SUB!
a
APPROVED
BY ORDER OF THE CHIEF OF ORDNANCE
STEEL
HDN.
CAPT.
FLAT
4
*
MAJOR ono. vertu. S.A. FRANKFORD ARSENAL ROCKWELL
SUPERSEDES
TRACER
C.J.S. | M.H.E.
TOOL
TO
GAGE LISTS
DRAFTSMAN |CHECKER
PIN
TOOL STEEL FINISH_/ HON. ALTERNATE DESIGN BODY it DIA. WITH ” FOR MARKING I= 4/0(.109) Xl. STEEL TAPER PIN
PERTAINS
Bui7e2i Bll2908
REVISION
DATE
OF 9-30-39
HARDNESS C63 TO 66 LAP fg SURFACES REMOVE ALL SHARP EDGES
DATE JUNE 11,1928
B2il725
MARKING :~37M.M. CART. CASE &MI7,
we t
J
Ss
7i-2-96,
7i-2-
MI6
REVISIONS
100,
THICKNESS WALL .055, INSP
BRAZE
B2I726
Conreent
, ORD, DEPT, U.S.A
oe
Se
roll
Tl-2-96 |8-3-: Ti -2-100)
30-39
ZERO SETTING AT .050 RED LINES AT 055 & .045 SETTINGS
HARDEN
aN
MAX. .0550 MIN. 0450
=
;
—)f
jan
C
|
Af
SPHERICAL POINT POLISHED
GF L.25+.01
7 /
s)
\
7.1 _
@
8 64
SreN7 (6 naam
+s
-
DRAWING PERTAINS TO
STAMP>MARKING
8 _
=
aes
8
Fd
Bu2908
FF =
8 °
DRAFTSMAN
STAMP
ba
SWEDISH
TYPE
PLUG GAGE
BLOCK
coe
821726
STAMP CHECK FOR ZERO SETTING .05 SETTING
TRACER
EJK.|MHE. | AP cwecxen | cnecNER DRAFTSMAN Ws 1 He.
—
Z
GAGE LISTS
Buli72i
CALIPER
GaP
GAGE
APPROVED BY ORDE OF THER
FEDERAL MODEL #49 OR EQUAL - INDICATOR C2I OR EQUAL SPECIAL DIAL MARKED WITH MAX. &
an. SET ce
ase
MAJOR oro. vert, vis. ROC! KW ELLHARDNES E S
C63
TO
LAP fg SURFACES
REMOVE
ALL
SHARP
66
EDGES
DATE B
RANT ORD
SEPT.30,
?| 72
ARSENAL
1939.
6
MARKING :~ 37 M.M.CART. CASE,
REVISIONS
MI7 & MI6,71 -2-100 & 7I-2-96
STAMP MARKING
/MAROEN —_———_
.
=sl0:
-19697—-0002 AT LARGE END
Ly
zis
(\
LC
i\
ie=
.9650+000 AT LARGE END r4
[pea
-(—._
7 | aMes cere y
— TAPER .0068 PER INCH | ON DIA. a
STAMP=CHECK FOR oe
rt
carer :
i ce
ry
cy —
Sdke | STAMP>CHEGK FOR wry Pee
a
aa
DIA. UNDER FLANGE, INSP
ny
Beier?
71-2-968-3-39 7i_-2-100 9-11-39 [9-30-39
ee
=
a
Si
z\3
a aor
ko
~— a
/ TAPER 0068 PER INCH ON DIA.
cea
TAPER GHECK PLUG GAGE AMERICAN GAGE DESIGN STANDARD — TAPER LOCK EXCEPT AS SHOWN STAMP MARKING
=x (s)
Pas
=
{ ee
ao5 7
STAMP-MARKING
b-dfe)
|
xe oO
t
(
lr Tim rs
oe J
|
#2
4 ad “I. z
4
030 R.
PERTAINS
GAGE LISTS
DRAFTSMAN | TRACER W.M&M.| M.H.E. CHECKER | CHECKER
L'D’G DRAFTSMAN
je
035
SUPERSEDES AS52354 UNDER REV. DATE OF 9-30-39
FLANGE
TAPER RING GAGES AMERICAN GAGE DESIGN STANDARD HARDEN
CHIEF DRAFTSMAN
Hs
“Cllr
R
CAPT.
STAMP GO 1.97 FACE MUST TOUCH
TO
Bilz908
Bu72I
210
> z ) ¥
4
DRAWING
5=
STAMP=NOT GO 1.965 FACE MUST NOT TOUCH
APPROVED
FLANGE
“ORD. DEPT. U.S.A.
BY ORDER OF THE H) IF ORDNANCE
Movie] MAJOR FRANKFORD
ROCKWELL HARDNESS C63 TO 66 LAP fg SURFACES REMOVE ALL SHARP EDGES
ak
oro. vert..u.s.4 ARSENAL
DATE SEPT.30,1939
Betwer
SUPERSEDES BilI72| UNDER REVISION DATE OF 9-30-39
CARTRIDGE
NAME
COMPONENT 7I-2-100 | CASE,
DRAWING PROFILE
MOUTH
GAGE
FILE
FLUSH PIN
PLUG/B
1012-2
€10785
A 52353
A 52358
21727 A 5235! A 52352
|B 21727
[DIOII2-2 _[DIOII2-2 621727
C 10786 A 52359 A 52363 __|
ADJ. SNAP CALIPER. IND.
INDICATOR SNAP SNAP
APPROVED:-BY ORDER
B72!
FRANKFORD
TRACER W.F.
Cc
CAPT. OF THE
DATE JUNE 11, 1928.
DEPT., U. S.A.
SHEET Ne. 1OF |
Frankford Arsens|—g- 10-24—1,000,
ARSENAL
AS52361_| A 52355 17.
PROG. PLUG
TAPER PLUG A52356_| D.E. PLAIN PLUG |A 52357 FLUSH PIN iB 217
TEMPLATE
SNAP
CASE, CARTRIDGE 37MM. MI7 INSPECTION
LIST For;
CONC. PRIMER HOLE TOTAL LENGTH LENGTH PRIMER BOSS
THICK. WALL_AT MOUTH THICK. WALL .055
INSIDE DIA. AT
DIA. PRIMER HOLE DIA. PRIMER HOLE C'BORE. DEPTH PRI. HOLE C'BORE.
GROOVE
GROOVE
EXTRACTOR
THICKNESS BASE
WIDTH
RING
0.E. TAPER ADJ. SNAP SNAP
GO
TAPER
PLUG
PLUG PLUG RING
CHECK FOR GO & NOT DIA. FLANGE THICKNESS FLANGE
TAPER
DIA. UNDER FLANGE NOT GO
BOT. OF BODY
Diol2-1
DRAWING
ALIGNM'T. PLUG|DIOII2-1 TAPER PLUG |DIOII2-2
TAPER PLAIN TAPER
MIT CHECK
TYPE CHAMBER
LIMIT CHECK SHOULDER LIMIT CHECK NECK DIA. UNDER FLANGE GO
a a
GAGE
CHECK FOR ALIGNMENT LIMIT CHECK TOP OF BODY
MAX.
FUNCTION
DIA. EXTRACTOR
REVISIONS
T
7i-2-96 CASE, CARTRIDGE
NAME
COMPONENT DRAWING | FUNCTION
OF BODY TOP
C'BORE.
GAGE
D 10118-1
DRAWING
APPROVED:-BY ORDER 1EF O
FRANKFORD
ARSENAL
C10786 | A 52359 |
INDICATOR
SNAP
_| |B A A B
21725 5236! 52355 21726
|A 52356 |A 52357
Cc 10785
FLUSH PIN PROG. PLUG ADJ. SNAP | IPER-
TAPER PLUG D.E. PLAIN PLUG
PIN
A 523)
FLUSH
SNAP
A 52362 A 52352
SNAP
21727 21727 21727
10118-2
SNAP
ADJ.
TAPER PLUG TAPER PLUG D PLAIN PLUG B TAPER RING B TAPER RING D.E. TAPER PLUGB
ALIGNM'T. PLUG |D IO1I8-1
CHAMBER
TYPE
CASE, CARTRIDGE 37MM. M56, INSPECTION
LIST For;
DEPTH PRI. HOLE C BORE. INSIDE DIA. AT MOUTH THICK. WALL AT MOUTH THICK. WALL .O55 CONG. PRIMER HOLE TOTAL LENGTH
DIA. PRIMER HOLE
OPER. NO.
GAGE
LIMIT CHECK BOT. OF BODY LIMIT CHECK SHOULDER LIMIT CHECK NECK DIA. UNDER FLANGE GO DIA. UNDER FLANGE NOT GO CHECK FOR GO & NOT GO DIA. FLANGE THICKNESS FLANGE LENGTH PRIMER BOSS THICKNESS BASE DIA. PRIMER HOLE
LIMIT CHECK
MAX. PROFILE CHECK FOR ALIGNMENT
REVISIONS
OF THE
“Una. A DATE SEPT. 30, 1939
VY).
B 112908)" oF"
NOTE.
FLUSH PIN TO BE FLUSH WITH STEPS
‘OR MAX & MIN. POSITIONS, ARM TO
Mankinc: 37MM. CART. CASE MI6 & MI7, TI-2-96 & Ti-2-100, THICKNESS BASE, INSP
SLIDE FREELY WITHOUT SiDE PLAY.
alae
PNT
MAX. 25 OT
\ bd-
t.:
fe)
.
J, a
—?7 TT — '
38os
-
$8
'
x2
|| !
|
1
ae |
SLIDE FIT IN b _
;
eet,
op] me
|
|
z
STAMP MARKING
Snr
AST
/
|
ENLARGED VIEW OF POST =|
E 420-008
ast
|
wl
2HOLES
oO
‘
| :
DIA. C BORE EACH END—
1
Lili 2
|
REVISIONS
SEEA
NDIGATOR rine
ik
ts.
FIT FOR @)
te
FIT For (2)
ALTERNATE DESIGN (6) BASE-MACH. STEEL FINISH -f- WITH TOOL
i iE
AP
~20NG
-|
STEEL BUSHING HARDENED & DRIVEN INTO BASE
4— BASE
ASSEMBLY TAPER .006 INCH ON THE DIA. PER INCH OF LENGTH.
s
5510 SLIDE FIT FOR(2)
@ [ang
.
a
1)
" Lorive Fir
[1's
LBLSLIDE FIT FoR ®
H
a POCATE TO STOP INDICATOR ON ¢
DIAL:- MAX. VARIATION .02 ORD. DEPT, U.S.A.
gio
an
H
935 WITH POINTER AT ZERO |
~
os Coes |
;
H
1
=e
‘
:
ar
R
1
'
+ ORD. DEPT, U.S.A
:
if
i
Clio786
TE! FINISH ¢ -HARDEN 3€,
1- 4x! DRILL
ROD PIN
YMBOL
| - , q-2ONe,
|
—
DRAWING
Pea
P
eui72i 12908
1
3 —+ HANDLE DRILL =O
THUM MACH. STEEL
FINISH 7 -CASE HARDEN @ ROCKWELL HARDNESS ISN9O MIN. >€ ROCKWELL
HARDNESS
C63 TO 66
LAP fg SURFACES REMOVE ALL SHARP EDGES
DATE SE PT.30, 1939
C-1o786|
AMP
MARKING
NSS
as
+}
ee + gekao33
PSS
a
Can
ai
‘
|
i.
NI
: Hy 3
49600 FIT TO CHECK-
~
‘Fe
a
1
‘
\‘
men ‘\ .
cA
fal //
eee
257 DEM
FOR $ KEY PIN.
—
S4S*CWNIER?
4
e
yy
:
=e odgeane
_
bi
a
/
a
oA
7
L i.
‘GM STEEL-CASE HON
~
oh
+)
sil
Os
+ | zs
vim
[eae Barres. sr
OIE
KEY
PINS
of ner $M SS
\2570RILL 3%
ATASSEMBL
OLEP
ALY
FIN
3
a
[ D-1012. [ror
GAGE FOR MAX. PROFILE.
FRANKFORD ARSENAL USA. JUNE, 1D i CLOUCLE.
ROCKWELL ISN SOMIN. ae C63 7066 LAP fyALLSURFACES. EMOVE SHARP EDGES.
4
y- | 37MM CARTRIDGE CASE M/Z
:
;
ma
FOR ACCEPTANCE ALL 4y SURFACES MUST LEAVE PRECISION CENTERS IN HANOLES
BE
MM. CART. CASE, mannina-37
TRUE & CONCENTRIC.
STAMP: LIMIT CHECK FOR TOP OF BODY MUST NOT ENTER BELOW SURFACE
6.
-01
F3-4
—
tf 7 ie
ee
i
ae
Saar
LIMIT CHECK BOTTOM OF BODY 1.9304 AT 5.9 LENGTH.
=
—
—
#_ +
—
—
—
-
a
x Hex. nut) 1-948 NF-2
Oo —4 + — 4 :
=)
| ____
u
D®
bal
21d
las
03
—
oR SAE ‘ OME. (SEE ASSEM.
soo 2
FP,
ron oS.
FOR
®
a
=
ye eee eS
+—
—
_____4 1g SUE FIT FOR @*14-
SLIDE FIT FOR ®, a
ima
ps
Zhen
SPA
* 1
z
| -_ ges, 70, en
:
7.340 + 001 grant,
ae
AAR
id
[ome | a, STR DRIEN '
er
.
APs =a
ae
AE 5
sof,
|
ee
reewe
oR
ramen [ca ~.
—— CHECK SHOULDER
wee ENTER
[-———
~I2NF-2X
U.678
6.93-.01 ————~
SS
res :
4
7
+008
“8
————————
aaa
ae
19) 30" +>
Lh
~
SLIDE Ee
EQTHICK JAM NUT
ioe Agia Ee
aude
eo
SLIDE FIT ON
r
e SN
2g
os
Lh
es
1 Leame rit on @)
2H
|
©
NF-2
6.235 SEE
ASSEM. +
© Eres =
a
i
ere
7 ite
2
nie
ie
Tee
ASSEM. —
=
GHEG GAGE CONE (@) rte K
I>} -18 NF~2 xgSHex. nut (3)
“
ba
ES
—
3
bappawregirnc oad wTCO) H-Bo.0. x R10. xg THICKn STEEL WASHER (2)
ro
“4 +
NOTE
|
La